Most viewed |

1101 210322 9745174 viewsRobe River ore waggon 1101, built by Bradken Rail Qld in April 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021.
|
|

240619 0415174 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31481 is a master and is bar coupled to slave waggon 36481 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
|
|

240619 0420174 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31467 is a master and is bar coupled to slave waggon 36467 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
|
|

240619 0422174 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31485 is a master and is bar coupled to slave waggon 36485 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
|
|

240619 0442174 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31449 is a master and is bar coupled to slave waggon 36449 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
|
|

240701 2381174 viewsWestern Creek, 67 km, Rio Tinto's GE built ES44DCi locomotive 9141 with serial number 64731, delivered in 2018 from the sixth order of this model from GE leads an ES44DCi and 9-44CW locomotives as they snake around the curve between Western Creek and Green Pool with a loaded train of the second rake of blue waggons bound for Cape Lambert. Captured on July 1, 2024.
|
|

240701 2463174 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31676 is a master and is bar coupled to slave waggon 36676 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
|
|

100606 9455173 viewsParkeston, Pacific National crew car RZEY type RZEY 1 was built by the South Australian Railways Islington Workshops in 1958 as Mururi for The Overland as a corten steel roomette sleeping car, coded JRA 1 in 1987, loaned to V/Line in 1992 for the Vinelander, scrapped in 1995 and sold to International Development Services, 1998 sold to West Coast Rail, sold to Australian Locomotive and Railway Carriage Company in 2004, then rebuilt into crew car by BlueBird Rail Operations in 2007.
|
|

150530 8337173 viewsWoodbridge, Pacific National RZAY type crew accommodation car RZAY 283 was built by Comeng NSW as an ARJ type stainless steel air conditioned first class roomette sleeping car ARJ 283 in 1972, sold to National Rail and converted to a crew car in 1997. Destroyed at the Jumperkine collision in December 2019.
|
|

0002 060722 7593173 viewsRobe River ore waggon 002, built by Nippon Sharyo Nihon, rotary coupler end handbrake side empty, partial view at the 11.7 km, Cape Lambert. July 22, 2006.
|
|

0016 160306 1244173 viewsRobe River ore waggon 016, built by Nippon Sharyo Nihon, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
|
|

0023 110602 1718173 viewsRobe River ore waggon 023, built by Nippon Sharyo Nihon, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
|
|

0053 060722 7592173 viewsRobe River ore waggon 053, built by Nippon Sharyo Nihon, rotary coupler end handbrake side empty view at the 11.7 km, Cape Lambert. July 22, 2006.
|
|

0055 060722 7488173 viewsRobe River ore waggon 055, built by Nippon Sharyo Nihon, handbrake side loaded view at the 78.8 km between Western Creek and Maitland on the Deepdale line. July 22, 2006.
|
|

0068 110602 1740173 viewsRobe River ore waggon 068, built by Nippon Sharyo Nihon, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
|
|

0076 170729 0225173 viewsRobe River ore waggon 076, built by Nippon Sharyo Nihon, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
|
|

0080 170728 09943173 viewsRobe River ore waggon 080, built by Nippon Sharyo Nihon, non-handbrake side loaded view at the 72 km, Western Creek on the Deepdale line. July 28, 2017.
|
|

0102 160306 1534173 viewsRobe River ore waggon 102, side looks to have been repaired by Centurion Industries WA, note waybill holder and no plate indication, fixed coupler non-handbrake side loaded view at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
|
|

0108 170728 09793173 viewsRobe River ore waggon 108, built by Nippon Sharyo Nihon, non-handbrake side loaded view at the 72 km, Western Creek on the Deepdale line. July 28, 2017.
|
|

0158 160306 1470173 viewsRobe River ore waggon 158, built by Nippon Sharyo Nihon, fixed coupler handbrake side loaded view at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
894 |  |
 |
 |
 |
 |
 |
 |
|