Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
240619_0428.jpg
240619 0428202 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31490 is a master and is bar coupled to slave waggon 36490 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
0730_050110_175330.jpg
0730 050110 175330201 viewsRobe River ore waggon 730, built by Tomlinson Steel WA, handbrake side view empty. Of note is it is rotary bar coupled to 074. Harding Siding on the Cape Lambert line, 1753 hours, January 10, 2005.
6002_041014_154944.jpg
6002 041014 154944201 viewsRobe River ballast waggon 6002, built by Tomlinson Steel WA, Cape Lambert yard. 1549 hours, October 14, 2004.
6003_041014_154954.jpg
6003 041014 154954201 viewsRobe River ballast waggon 6003, built by Tomlinson Steel WA, Cape Lambert yard. 1549 hours, October 14, 2004.
0520_060716_7187.jpg
0520 060716 7187201 viewsRobe River ore waggon 520, built by Tomlinson Steel WA, fixed coupler end handbrake side loaded view at the 71 km on the Deepdale line, Western Creek, July 16, 2006.
0022_170728_09914.jpg
0022 170728 09914201 viewsRobe River ore waggon 022, built by Nippon Sharyo Nihon, non-handbrake side loaded view at the 72 km, Western Creek on the Deepdale line. July 28, 2017.
0071_141124_6796.jpg
0071 141124 6796201 viewsRobe River ore waggon 071, built by Nippon Sharyo Nihon, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
0109_170513_8670.jpg
0109 170513 8670201 viewsRobe River ore waggon 109, built by Nippon Sharyo Nihon, rotary coupler end handbrake side loaded view, Cape Lambert yard, May 13, 2017.
0244_060722_7620.jpg
0244 060722 7620201 viewsRobe River ore waggon 244, built by Nippon Sharyo Nihon, rotary coupler end handbrake side empty view, at the 11.7 km, Cape Lambert. July 22, 2006.
0265_160727_0990.jpg
0265 160727 0990201 viewsRobe River ore waggon 265, built by Nippon Sharyo Nihon, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.
0498_061209_8184.jpg
0498 061209 8184201 viewsRobe River ore waggon 498, built by Tomlinson Steel WA, non-handbrake side loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2006.
0819_060722_7612.jpg
0819 060722 7612201 viewsRobe River ore waggon 813, built by Centurion Industries WA, rotary coupler end handbrake side empty partial view, at the 11.7 km, Cape Lambert. July 22, 2006.
1180_141124_6870.jpg
1180 141124 6870201 viewsRobe River ore waggon 1180, built by Bradken Rail Qld in April 2012, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
IC22_060722_7637.jpg
IC22 060722 7637201 viewsRobe River compressor waggon set IC 22 with air receiver and IC 23 with two Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons and used on the pooled fleet rakes that come from HIY [Yandicoogina] and West Angelas mines. Cape Lambert, July 22, 2006.
0794_180616_1727.jpg
0794 180616 1727201 viewsRobe River ore waggon 794, built by Centurion Industries WA, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
0455_060716_7188.jpg
0455 060716 7188200 viewsRobe River ore waggon 455, built by Tomlinson Steel WA, fixed coupler end handbrake side loaded view at the 71 km on the Deepdale line, Western Creek, July 16, 2006.
0005_060722_7495.jpg
0005 060722 7495200 viewsRobe River ore waggon 005, built by Nippon Sharyo Nihon, handbrake side loaded view at the 78.8 km between Western Creek and Maitland on the Deepdale line. July 22, 2006.
0095_170729_0223.jpg
0095 170729 0223200 viewsRobe River ore waggon 095, built by Nippon Sharyo Nihon, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
0163_060722_7606.jpg
0163 060722 7606200 viewsRobe River ore waggon 163, built by Nippon Sharyo Nihon, rotary coupler end handbrake side empty view, panel repair with Centurion Industries waybill holder, at the 11.7 km, Cape Lambert. July 22, 2006.
0201_170728_09946.jpg
0201 170728 09946200 viewsRobe River ore waggon 201, built by Nippon Sharyo Nihon, non-handbrake side loaded view at the 72 km, Western Creek on the Deepdale line. July 28, 2017.
19220 files on 961 page(s) 853

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional