Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
0547_170513_8696.jpg
0547 170513 8696174 viewsRobe River ore waggon 547, built by Tomlinson Steel WA, handbrake side loaded view, Cape Lambert yard, May 13, 2017.
0822_081209_0119.jpg
0822 081209 0119174 viewsRobe River ore waggon 822, built by Centurion Industries WA, rotary coupler end panel and plate view at the 7 km location just south of Cape Lambert yard. December 9, 2008.
0067_180616_1700.jpg
0067 180616 1700174 viewsRobe River ore waggon 067, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
240619_0428.jpg
240619 0428174 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31490 is a master and is bar coupled to slave waggon 36490 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
July_1980_Victoria_Stocktake_Instructions.pdf
July 1980 Victoria Stocktake Instructions173 viewsInstructions for the rolling stock stocktake from July, 1980.
Covers details of requirements and has good detail on tarpaulins and the various bogie types with a picture of each bogie.
50 pages, 17 MB download.
0613_160306_1590.jpg
0613 160306 1590173 viewsRobe River ore waggon 613, built by Tomlinson Steel WA, fixed coupler non-handbrake side loaded view, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
0229_050501_1778.jpg
0229 050501 1778172 viewsRobe River ore waggon 229, built by Nippon Sharyo Nihon, rotary coupler end handbrake side view loaded near the 107 km between Maitland Siding and the Fortescue River on the Deepdale line. 1129 hours, May 1, 2005.
6002_041014_154944.jpg
6002 041014 154944172 viewsRobe River ballast waggon 6002, built by Tomlinson Steel WA, Cape Lambert yard. 1549 hours, October 14, 2004.
1031_110602_1662.jpg
1031 110602 1662172 viewsRobe River ore waggon 1031, built by Bradken Rail Qld in September 2008, rotary coupler end handbrake side loaded view, instrumented vehicle, at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
0059_081209_0115.jpg
0059 081209 0115171 viewsRobe River ore waggon 059, built by Nippon Sharyo Nihon, non-handbrake side loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2008.
0282_170728_09937.jpg
0282 170728 09937171 viewsRobe River ore waggon 282, built by Nippon Sharyo Nihon, non-handbrake side loaded view at the 72 km, Western Creek on the Deepdale line. July 28, 2017.
0958_170729_0236.jpg
0958 170729 0236171 viewsRobe River ore waggon 958, built by Centurion Industries WA, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
1045_180616_1715.jpg
1045 180616 1715171 viewsRobe River ore waggon 1044, built by Bradken Rail Qld in March 2012, rotary coupler end non-handbrake side empty view, at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
0019_160306_1517.jpg
0019 160306 1517170 viewsRobe River ore waggon 019, built by Nippon Sharyo Nihon, fixed coupler non-handbrake side loaded view at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
0051_141124_6775.jpg
0051 141124 6775170 viewsRobe River ore waggon 051, built by Nippon Sharyo Nihon, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
0251_170728_09934.jpg
0251 170728 09934170 viewsRobe River ore waggon 251, built by Nippon Sharyo Nihon, non-handbrake side loaded view at the 72 km, Western Creek on the Deepdale line. July 28, 2017.
0642_110602_1671.jpg
0642 110602 1671170 viewsRobe River ore waggon 642, built by Tomlinson Steel WA, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
1063_170728_09914.jpg
1063 170728 09914170 viewsRobe River ore waggon 1063, built by Bradken Rail Qld in March 2012, non-handbrake side loaded view at the 72 km, Western Creek on the Deepdale line. July 28, 2017.
0067_170729_0239.jpg
0067 170729 0239169 viewsRobe River ore waggon 067, built by Nippon Sharyo Nihon, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
0071_141124_6796.jpg
0071 141124 6796169 viewsRobe River ore waggon 071, built by Nippon Sharyo Nihon, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
19088 files on 955 page(s) 849

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional