Most viewed |

250501 0410257 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2349 - GA 2350, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

240328 2875254 viewsWOE type iron ore waggon WOE 33707 is from a batch of two hundred and twenty seven built by UGL Rail WA between from 08-2011 and 02-2012 of the current style of 82.5 tonne load capacity WOE class waggons and had fleet number 7118, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
|
|

284-13254 viewsNarngulu yard looking south east across the grade crossing for Rudds Gully Road with the line to Mullewa curving away to the left and the line to Dongara curving away to the right. November 9, 2004.
|
|

250501 0393254 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3211 - GA 3212, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

250501 0323253 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3073 - GA 3074, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0507252 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2963 - GA 2964, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

081225 0566251 viewsBarker Siding, one of FMG's thirty five ballast waggons, BH 11, non-handbrake end view, 100 tonne capacity, built in China by CSR at the Yangtze Rolling Stock Company in 2008. December 25, 2008.
|
|

284-35250 viewsBing Siding, 18 km south of Nelson Point and BHP's GE built AC6000 unit 6075 'Newman', serial number 51097, holds the mainline with a loaded train and EMD SD40R unit 3095 as second unit. Late 2004.
|
|

250501 0391247 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3295 - GA 3296, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

081225 0554240 viewsBarker Siding, one of FMG's thirty five ballast waggons, BH 24, 100 tonne capacity, built in China by CSR at the Yangtze Rolling Stock Company in 2008. December 25, 2008.
|
|

250501 0375239 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2477 - GA 2478, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

0547 170729 0197223 viewsRobe River ore waggon 547, built by Tomlinson Steel WA, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
|
|

0664 060716 7192221 viewsRobe River ore waggon 664, built by Tomlinson Steel WA, fixed coupler end handbrake side loaded view at the 71 km on the Deepdale line, Western Creek, July 16, 2006.
|
|

0316 160306 1326209 viewsRobe River ore waggon 316, built by Nippon Sharyo Nihon, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
|
|

1145 160727 0957208 viewsRobe River ore waggon 1145, built by Bradken Rail Qld in March 2012, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.
|
|

0243 160306 1475207 viewsRobe River ore waggon 243, built by Nippon Sharyo Nihon, fixed coupler handbrake side loaded view at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
|
|

0544 160306 1460204 viewsRobe River ore waggon 544, built by Tomlinson Steel WA, fixed coupler handbrake side loaded view, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
|
|

WTT 15-69 Easter Holiday Period 1969198 viewsEaster Holiday Period, 1969.
Full Passenger Train Service Country & Interstate.
17th February, 1969.
148 pages, 35 MB download.
|
|

1043 210322 9697198 viewsRobe River ore waggon 1043, built by Bradken Rail Qld in March 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021.
|
|

100602 8609194 viewsWest Kalgoorlie, crew accommodation coach QCAY 5 was built by the South Australian Railways Islington Workshops in 1958 as Juki for The Overland as a corten steel roomette sleeping car. Sold to Blue Bird Rail in 1997, then to Grand Corporate Rail, renamed BMC 2, in 2003 sold to Great Southern Railway and renamed Sir John Forrest. Purchased by Bluebird Rail and converted to crew car and then sold to Queensland Rail.
|
|
| 19088 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
846 |  |
 |
 |
 |
 |
 |
 |
|