Most viewed |

134-06600 viewsKagaru, station overview, station building, waiting room, signal box, staff exchange platform, looking south.
|
|

199-02600 viewsToodyay West, empty grain train with standard gauge Westrail L class L 263 Clyde Engineering EMD GT26C serial 68-553 and forty empty waggons at Northam-Toodyay Rd Katrine. 1316 hrs on 21st June 1997.
|
|

200-20600 viewsMidland, Westrail's Clyde Engineering built EMD model G26C as the DA class, DA 1573 serial 72-760 and DA 1574 serial 72-761 lead an empty grain train to Avon past the Midland Workshops at 0925 hrs 24th June 1997.
|
|

205-01600 viewsRoebourne - Wittenoom Road, Chichester Downs, camp located 4 km east of Rio Tinto railway, sign says it all.
|
|

207-17600 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit, view of the left hand side cab and steerable bogie.
|
|

030405 140050600 viewsKyancutta, yard view looking south along the narrow gauge mainline with the Eyre Highway grade crossing in the distance and one of only two electrically lit signals on the Eyre Peninsula Division. 5th April 2003.
|
|

030409 080852600 viewsWarramboo, empty grain departs following a crew change. Rebuild unit DA 7 in Australian Southern orange and black livery leads a pair of AE Goodwin built ALCo model DL531 830 class units 872 and 871, the SACBH concrete silo and Ascom silo complexes behind it.
|
|

060527 4100600 viewsScotia, AZKY type anhydrous ammonia tank waggons AZKY 32234 and AZKY 32240, two of twelve such waggons built by Goninan WA in 1998 as type WQK for Murrin Murrin traffic, fitted with Brambles anhydrous ammonia tanks A9N and A2T.
|
|

223-10600 viewsPossum Siding, Hamersley Iron rail grinder, Speno built RR 48 M-1 model sits in the back track siding. 21st October 2000.
|
|

151111 9481600 viewsCape Lambert Yard, Chinese built Bradken ore cars, control car 20292 and slave car 25292.
|
|

160522 2030600 viewsParkeston, 5MP2 steel train, RKCX type open waggon RKCX 1001, originally built by Victorian Railways Bendigo Workshops in 1974 as a member of the ELX type open waggons, in 1979 recoded to VOBX and then VOCX in 1980. To NRC in 1994, ROBX, then current code in 1995.
|
|

160522 2033600 viewsParkeston, 5MP2 steel train, Trans-Perth electric B Set 116, driving car BEA 4116 being transferred from the manufacturer in Qld to Perth.
|
|

160522 2219600 viewsParkeston, SCT train 6MP9 operating from Melbourne to Perth departs for West Kalgoorlie and eventually Perth behind EDI Downer built EMD model GT46C-ACe unit SCT 007 'Geoff (James Bond) Smith' serial 97-1731 with 76 waggons for 5382 tonnes and 1800 metres length.
|
|

116-01599 viewsSpencer Street Station Platform No.1, V/Line standard gauge G class G 521 Clyde Engineering EMD model JT26C-2SS serial 85-1234 has arrived in Melbourne with the overnight train from Sydney, by the look of those hair styles it would have to be the very early 1990s!
|
|

108-15599 viewsMurchison East station platform building, goods shed.
|
|

134-04599 viewsKagaru, station overview, station building, waiting room, signal box, staff exchange platform.
|
|

195-20599 viewsWittenoom Gorge, view looking north along Joffre Creek, the former market garden area is in the middle, with Bolitho Rd skirting the creek.
|
|

196-09599 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
|
|

208-1-10599 viewsToodyay, emus at the Free Range Emu Farm.
|
|

216-07599 viewsDry Creek Yard, a pair of broad gauge V/Line C class locomotives rest between jobs.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
84 |  |
 |
 |
 |
 |
 |
 |
|