Most viewed |

250501 0504326 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3131 - GA 3132, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0518326 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3293 - GA 3294, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025
|
|

BH 07 250501 0622326 viewsThomas Yard, one of FMG's thirty five ballast waggons, BH 07, 100 tonne capacity, built in China by CSR at the Yangtze Rolling Stock Company in 2008. May 1, 2025.
|
|

190109 1700325 viewsBinduli, empty fuel train 4445, ATPF type fuel tank waggon ATPF 578, originally built by WAGR Midland Workshops in 1974 for Shell as type WJP 80.66 kL one compartment one dome, it also spent time in SA in 1985. Capacity now 80,350 litres, fitted with type F InterLock couplers. Under Viva Energy ownership.
|
|

160409 IMG 7089325 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160409 IMG 7254325 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

240328 2834325 viewsWOE type iron ore waggon WOE 33771 is from a batch of two hundred and twenty seven built by UGL Rail WA between from 08-2011 and 02-2012 of the current style of 82.5 tonne load capacity WOE class waggons with fleet number 7182, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
|
|

240328 2852325 viewsWOE type iron ore waggon WOE 33627 is from a batch of two hundred and twenty seven built by UGL Rail WA between from 08-2011 and 02-2012 of the current style of 82.5 tonne load capacity WOE class waggons and fleet number 7038, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
|
|

240328 2998325 viewsLoaded Koolyanobbing iron ore train 5041 with Mineral Resources Ltd MHPY type iron ore waggons MHPY 00235 and MHPY 00236 built by CSR Yangtze Co China with serial numbers 2014 / 382-235 and 2014 / 382-236 in 2014 as a batch of 382 pairs, these bottom discharge hopper waggons are operated in 'married' pairs. March 28, 2024.
|
|

258-28325 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068. Early May 2002.
|
|

240328 3168325 viewsWest Kalgoorlie yard and empty Pacific National fuel train 5445 to Esperance waits for departure time with second unit Goninan WA built GE model Cv40-9i NR class unit NR 113, serial number 7250-09 / 97-312 with thirty-one tanks for 705.7 tonnes and 607.4 metres. March 28, 2024.
|
|

240328 3210325 viewsLamington, on the outskirts of Kalgoorlie, 5472 nickel train from Leonora with Watco DQFY type container waggon DQFY 0417, Watco purchased twenty-nine CQFY waggons from CFCLA which were modified from Comeng NSW built BDX open waggons by ANI-Bradken NSW in 2001, carrying position 1 JTSU 021057[5] 20' 25NX type tank for Qube TNK00126, position 2 JTSU 023070[9] 20' 25NX type tank for Qube TNK00174. March 28, 2024.
|
|

250501 0329325 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2207 - GA 2208, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0529325 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2871 - GA 2872, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0551325 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2045 - GA 2046, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0553325 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2817 - GA 2818, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

BH 11 081225 0570325 viewsBarker Siding, one of FMG's thirty five ballast waggons, BH 11, EP-60 brake valve and manual release view, 100 tonne capacity, built in China by CSR at the Yangtze Rolling Stock Company in 2008. December 25, 2008.
|
|

190129 4308324 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00171 built by CSR Yangtze Co China serial 2014/382-171 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 4309324 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00172 built by CSR Yangtze Co China serial 2014/382-172 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

240328 2845324 viewsWOE type iron ore waggon WOE 33495 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-035 and had fleet number 8985 before the Aurizon yellow painted sides and logo, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
834 |  |
 |
 |
 |
 |
 |
 |
|