Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
130705_0604.jpg
130705 0604328 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.
210510_1143.jpg
210510 1143328 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 010 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
253-05.jpg
253-05328 viewsDugite near the 64 km on the Dampier - Tom Price railway, a loaded Hamersley Iron train headed up by General Electric 9-44CW unit 7078, from the original order with serial number 47757 roll past an empty train on the passing track with second unit 7076.
256-31.jpg
256-31328 viewsAt the 89.6 km grade crossing and with the meet at Maitland completed the loaded train continues onto Cape Lambert behind the quad CM40-8M working. May 2002.
160409_IMG_7106.jpg
160409 IMG 7106328 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
160412_IMG_7423.jpg
160412 IMG 7423328 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
240401_4974.jpg
240401 4974328 viewsKalgoorlie, Aurizon's 1029 Malcolm Freighter, waggon AQNY 32153, one of sixty two waggons built by Goninan WA in 1998 as the WQN type for Murrin Murrin container traffic loaded with two 20' sulphur containers, a 25U0 hard top BISU 100040[3] and 25UA roll top Bis Deliver Every Day BICN 108100[1]. 1st of April 2024.
240328_2806.jpg
240328 2806328 viewsWOE type iron ore waggon WOE 33498 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-038 and fleet number 8996, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
240328_2911.jpg
240328 2911328 viewsWOE type iron ore waggon WOE 33525 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-065 and fleet number 9038, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
258-03.jpg
258-03328 viewsNelson Point, Goninan GE rebuild C36-7M unit 5512 serial 4839-01 / 88-077 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. May 2002.
258-10.jpg
258-10328 viewsNelson Point, Goninan GE rebuild C36-7M unit 5513 serial 4839-02 / 88-078 is in the process of being removed from site bound for Goninan, Bassendean, Perth. May 2002.
240328_3199.jpg
240328 3199328 viewsWest Kalgoorlie, Viva Energy's APTF type fuel tank waggon ATPF 572 built by WAGR Midland Workshops in 1974 for Shell, in a batch of nine, as a WJP type 80,660 litre, one compartment one dome tank waggon, with a SFL of 80,500 litres, fitted with type F InterLock couplers. Pacific National empty fuel train 5445 to Esperance. March 28, 2024.
240328_3105.jpg
240328 3105328 viewsHampton Ballast Siding, Watco's 5WS4 loaded acid transfer train with 57' DQHY type flat waggon built by CRRC, China in 2022 as a batch of sixty for Watco to carry the CSA acid tanks, DQHY 13044 with CSA-0131 acid tank. March 28, 2024.
240328_3211.jpg
240328 3211328 viewsLamington, on the outskirts of Kalgoorlie, 5472 nickel train from Leonora with Watco DQFY type container waggon DQFY 0418, Watco purchased twenty-nine CQFY waggons from CFCLA which were modified from Comeng NSW built BDX open waggons by ANI-Bradken NSW in 2001, carrying position 1 JTSU 023067[4] 20' 25NX type tank for Qube TNK00171, position 2 JTSU 021994[7] 20' 25NX type tank for Qube TNK00063. March 28, 2024.
250501_0343.jpg
250501 0343328 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2923 - GA 2924, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0397.jpg
250501 0397328 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3013 - GA 3014, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0459.jpg
250501 0459328 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2645 - GA 2646, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0465.jpg
250501 0465328 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2127 - GA 2128, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0474.jpg
250501 0474328 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2101 - GA 2102, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0478.jpg
250501 0478328 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2515 - GA 2516, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
19220 files on 961 page(s) 832

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional