Most viewed |

190109 1699334 viewsBinduli, empty fuel train 4445, ATQF type tank waggon ATQF 611, built by Indeng Qld 1982 for Shell as type WJQ, 79.34 kL one compartment one dome, fitted with type F InterLock couplers. Indeng name still visible at far end. Under Viva Energy ownership.
|
|

160409 IMG 7177334 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160412 IMG 7336334 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160412 IMG 7409334 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160412 IMG 7449334 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

240328 2833334 viewsWOE type iron ore waggon WOE 33774 is from a batch of two hundred and twenty seven built by UGL Rail WA between from 08-2011 and 02-2012 of the current style of 82.5 tonne load capacity WOE class waggons with fleet number 7185, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
|
|

240328 2860334 viewsWOE type iron ore waggon WOE 33355 is one of a batch of one hundred and forty one built by United Goninan WA between November 2005 and April 2006 with serial number 950142-060 and fleet number 854, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
|
|

240328 2912334 viewsWOE type iron ore waggon WOE 33623 is from a batch of two hundred and twenty seven built by UGL Rail WA between from 08-2011 and 02-2012 of the current style of 82.5 tonne load capacity WOE class waggons with serial number R0067-035 and fleet number 7034, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
|
|

240328 2943334 viewsWOE type iron ore waggon WOE 33611 is from a batch of two hundred and twenty seven built by UGL Rail WA between from 08-2011 and 02-2012 of the current style of 82.5 tonne load capacity WOE class waggons and with fleet number 7022, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
|
|

240328 2958334 viewsWOE type iron ore waggon WOE 33831 is from a batch of thirty built by UGL [United Goninan Limited] in China during November and December 2015 in the brown paint colour with Aurizon logos, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
|
|

240328 2983334 viewsLoaded Koolyanobbing iron ore train 5041 with Mineral Resources Ltd MHPY type iron ore waggons MHPY 00088 and MHPY 00087 built by CSR Yangtze Co China with serial numbers 2014 / 382-88 and 2014 / 382-87 in 2014 as a batch of 382 pairs, these bottom discharge hopper waggons are operated in 'married' pairs. March 28, 2024.
|
|

240328 3025334 viewsLoaded Koolyanobbing iron ore train 5041 with Mineral Resources Ltd MHPY type iron ore waggons MHPY 00002 and MHPY 00001 built by CSR Yangtze Co China with serial numbers 2014 / 382-2 and 2014 / 382-1 in 2014 as a batch of 382 pairs, these bottom discharge hopper waggons are operated in 'married' pairs. March 28, 2024.
|
|

240328 3172334 viewsWest Kalgoorlie, Viva Energy's NTAY 6131 fuel tank waggon, built by Indeng Qld in 1979 for Shell as SCA 282, fitted with conventional couplers, on Pacific National's train 5445 empty fuel to Esperance. March 28, 2024.
|
|

240328 3223334 viewsLamington, on the outskirts of Kalgoorlie, 5472 nickel train from Leonora with Watco DQMY type container waggon DQMY 12001, these two pack bar coupled waggon pairs were built in 2022 by CRRC, China for Watco in a batch of thirty-seven, carrying position 1 QUBU 300679[0] 20' Qube half height rotatable container, position 2 QUBU 300726[7] 20' Qube half height rotatable container. March 28, 2024.
|
|

250501 0332334 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2845 - GA 2846, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0526334 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2885 - GA 2886, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0530334 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2429 - GA 2430, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

150326 IMG 4338333 viewsWest Kalgoorlie, AZAY type waste oil waggon AZAY 23439, detail image, this waggon usually operates between Merredin Loco and Forrestfield, not normally seen here in the Goldfields. Peter Donaghy image.
|
|

190109 1430333 viewsBinduli, AQHY 30090 with CSA 0092, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana. CSA 0092 was built by VCare Engineering, India for Access Petrotec & Mining Solutions.
|
|

160409 IMG 7088333 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
826 |  |
 |
 |
 |
 |
 |
 |
|