Most viewed |

190129 4264350 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00017 built by CSR Yangtze Co China serial 2014/382-17 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 4337350 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00287 built by CSR Yangtze Co China serial 2014/382-287 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

131024 IMG 0664350 viewsWest Kalgoorlie, detail image of AZWY 30373 'Sputnik' loco oil and sand waggon. Peter Donaghy image.
|
|

141028 IMG 3272350 viewsWest Kalgoorlie, NTAY type fuel tank waggon NTAY 5455 with 62,000 litre capacity for BP. Refurbished by Gemco WA in June 2014 from ex Mobil Oil NTAF type tank waggon NTAF 5455. In BP Oil ownership. I think this is an Indeng Qld built NTAF 455 the final of seven such tanks built for Mobil of NSW in 1981. Peter Donaghy image.
|
|

190109 1422350 viewsBinduli, AQHY 30020 with CSA 0115, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana. CSA 0115 was built by VCare Engineering, India for Access Petrotec & Mining Solutions.
|
|

160409 IMG 7040350 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160409 IMG 7069350 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160409 IMG 7077350 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160409 IMG 7195350 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160409 IMG 7226350 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160412 IMG 7344350 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160412 IMG 7432350 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

283-11350 viewsHarding Siding on the Robe River line at the 42 kilometre post looking in the down direction towards Deepdale. Recently extended north end of the siding to accommodate the soon to be West Angelas traffic and longer trains. 22nd of May 2002.
|
|

231020 8292350 viewsBinduli, 5029 Malcolm Freighter, AQIY type 40' container waggon AQIY 00027 with two Bis Deliver Every Day roll-top 25UA type sulphur containers BICN 108100 and BICN 109200. The AQIY were originally built as the CQYY but CFCLA did not buy them, Bradken then stored them as KQYY. When Aurizon bought them they had the handbrake relocated to the middle of the waggon from the end.
|
|

231020 8172350 viewsParkeston, QQYY type 40' container waggon QQYY 57829 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 001634 with Cristal decal and yellow corner posts and CRM 000351 with Cristal decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|

231020 8218350 viewsParkeston, QQYY type 40' container waggon QQYY 57871 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000013 with Tronox decal and yellow corner posts and CRM 001075 with Cristal decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|

240401 4973350 viewsKalgoorlie, Aurizon's 1029 Malcolm Freighter, waggon AQNY 32151, type leader of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic loaded with two 20' 25U0 hard top Bis Industries sulphur containers BISU 100108[2] and BISU 100080[4]. 1st of April 2024.
|
|

240328 2954350 viewsWOE type iron ore waggon WOE 33414 is one of a batch of one hundred and forty one built by United Group Rail WA between November 2005 and April 2006 with serial number 950142-119 and a build date of 04/2006 with a revised load of 82.5 tonnes and was fleet number 8913. It has had the sides repainted Aurizon yellow and logo just visible. Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
|
|

258-26350 viewsNelson Point, old Loc Prep. Goninan GE rebuild C36-7M unit 5506 serial 4839-01 / 87-071 is waiting to be removed from site bound for Asset Kinetics in Maddington, Perth. Drivers cab side view. 5506 was rebuilt from NSW AE Goodwin built C636 ALCo number 5455 serial G6012-04 and was delivered in Mt Newman orange livery and originally named 'Mt Whaleback', after repainting into BHP blue was named 'Ethel Creek', then finally 'Mt Goldsworthy'. May 2002.
|
|

284-29350 viewsBing Siding, 18 km south of Nelson Point with a loaded train holding the mainline with newly delivered BHP Billiton EMD SD40R unit 3095 serial 33677 as the second unit behind an AC6000. Late 2004.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
805 |  |
 |
 |
 |
 |
 |
 |
|