Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
240328_2814.jpg
240328 2814351 viewsWOE type iron ore waggon WOE 33779 is from a batch of two hundred and twenty seven built by UGL Rail WA between from 08-2011 and 02-2012 of the current style of 82.5 tonne load capacity WOE class waggons with fleet number 7190, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
240328_2988.jpg
240328 2988351 viewsLoaded Koolyanobbing iron ore train 5041 with Mineral Resources Ltd MHPY type iron ore waggons MHPY 00209 and MHPY 00210 built by CSR Yangtze Co China with serial numbers 2014 / 382-209 and 2014 / 382-210 in 2014 as a batch of 382 pairs, these bottom discharge hopper waggons are operated in 'married' pairs. March 28, 2024.
240328_2989.jpg
240328 2989351 viewsLoaded Koolyanobbing iron ore train 5041 with Mineral Resources Ltd MHPY type iron ore waggons MHPY 00003 and MHPY 00004 built by CSR Yangtze Co China with serial numbers 2014 / 382-3 and 2014 / 382-4 in 2014 as a batch of 382 pairs, these bottom discharge hopper waggons are operated in 'married' pairs. March 28, 2024.
258-07.jpg
258-07351 viewsNelson Point, Goninan GE rebuild C36-7M unit 5512 serial 4839-08 / 87-076 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. May 2002.
284-36.jpg
284-36351 viewsBing Siding, 18 km south of Nelson Point and BHP's GE built AC6000 unit 6075 'Newman', serial number 51097, holds the mainline with a loaded train and EMD SD40R unit 3095 as second unit. Late 2004.
240328_3109.jpg
240328 3109351 viewsHampton Ballast Siding, Watco's 5WS4 loaded acid transfer train with 57' DQHY type flat waggon built by CRRC, China in 2022 as a batch of sixty for Watco to carry the CSA acid tanks, DQHY 13015 with CSA-0129 acid tank. March 28, 2024.
240328_3125.jpg
240328 3125351 viewsHampton Ballast Siding, Watco's 5WS4 loaded acid transfer train with 57' DQHY type flat waggon built by CRRC, China in 2022 as a batch of sixty for Watco to carry the CSA acid tanks, DQHY 13012 with CSA-0130 acid tank. March 28, 2024.
250501_0305.jpg
250501 0305351 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2039 - GA 2040, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0308.jpg
250501 0308351 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2249 - GA 2250, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0327.jpg
250501 0327351 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2971 - GA 2972, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0401.jpg
250501 0401351 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3001 - GA 3002, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0555.jpg
250501 0555351 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2431 - GA 2432, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
100731_02911.jpg
100731 02911350 viewsWOE type iron ore waggon WOE 31080 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-070 and fleet number 665 for Koolyanobbing iron ore operations, on loaded train 7415 at Binduli Triangle, 31st July 2010.
130703_0189.jpg
130703 0189350 viewsTooligie, mixture of steel and timber sleepers on the mainline. 3rd July 2013.
130703_0279.jpg
130703 0279350 viewsKaldow, HAN type bogie grain hopper waggon HAN 38, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130705_0573.jpg
130705 0573350 viewsLock, HCN type bogie grain hopper waggon HCN 36, originally an NHB type hopper NHB 1592 built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Fitted with a Moose Metalworks roll-top cover. 5th July 2013.
233-34.jpg
233-34350 viewsYandi Two, BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5634 'Boodarie' serial 8151-07 / 91-120 shows the ALCo heritage from the frame down and is wearing the teal and marigold logo. 5634 was the first CM40-8M rebuild for BHP. GeoData.
100329_8041.jpg
100329 8041350 viewsRio Tinto compressor waggon set CB 05, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons and the wheels are marked 70 kph max. Seen here just outside of 7 Mile. 29th March 2010.
210510_1100.jpg
210510 1100350 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 020 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
256-23.jpg
256-23350 viewsMaitland Siding, Robe River CM40-8M unit 9417 (2nd) leading an empty train passes sister unit 9414 heading up a loaded train. May 2002.
19220 files on 961 page(s) 804

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional