Most viewed |

130703 0254373 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
|
|

130703 0263373 viewsKaldow, third unit on a Port Lincoln bound grain train Genesee & Wyoming locomotive AE Goodwin ALCo model DL531 unit 859 'City of Port Lincoln' serial 84705, built in 1963, 859 started life at Peterborough, spent some years in Tasmania and even spent time in Perth on standard gauge before being transferred to the Eyre Peninsula system in 2003. 3rd July 2013.
|
|

130705 0582373 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left background is the Ascom silo complex (Block 5), then blocks 2, 1 and 3, the train is on the mainline with the horizontal bunker (Block 4) on the right. 5th of July 2013.
|
|

130705 0593373 viewsLock, having stowed the loaded portion on the mainline, the three locos 1203, 846 and 859 shunt back on to the empty portion on goods siding #1.
|
|

100609 10009373 viewsMidland, ATEY 4724 diesel fuel tank waggon in service for BP Oil, former NSW AMPOL NTAF tank, coded WTEY when arrived in WA.
|
|

100611 0325373 viewsMidland, AQHY 30117 with sulphuric acid tank CSA 0025, originally built by the WAGR Midland Workshops in 1964/66 at WF type flat waggons, then following several codes and modifications in 1997 seventy five were converted to WQH to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana.
|
|

233-04373 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train can be seen about to enter the tunnel. GeoData.
|
|

234-32373 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking across the YT315.8 km grade crossing and 5658 back to the ore stockpile at the loadout. Circa 1998.
|
|

235-17373 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 leads the afternoon 240 waggon train with second unit Goninan built CM39-8 unit 5630 'Zeus' as the exit the loadout tunnel, notice the fuel tank differences between the lead unit an ALCo rebuild and the second unit built new.
|
|

160525 4400373 viewsKalgoorlie, Malcolm freighter, train 3029, AZKY type anhydrous ammonia tank waggon AZKY 32242, the final unit of twelve units built by Goninan WA in 1998 as type WQK for Murrin Murrin traffic, fitted with Bis Industries anhydrous ammonia tank.
|
|

161116 5556373 viewsBinduli, empty Shell fuel train 4443, ATPF type fuel tank waggon ATPF 578, originally built by WAGR Midland Workshops in 1974 for Shell as type WJP 80.66 kL one compartment one dome, it also spent time in SA in 1985. Capacity now 80,350 litres, fitted with type F InterLock couplers.
|
|

0512 Magor USA 050412 0761373 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 512.
|
|

0536 Magor USA 050518 2200373 viewsBing Siding. Rear 3/4 view of ballast train and of 1963 built Magor USA waggon 536, originally in ore service before conversion to a ballast waggon.
|
|

0710 CNR - QRRS China 150619 9074373 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggons 0710, 0706 and 0713 await their next duty.
|
|

241-23373 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. Drivers side cab view. June 2002.
|
|

243-07373 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan trails CM40-8M unit 5634 both in the new 'earth' or 'bubble' livery as they head up an empty train waiting departure time. August 2003.
|
|

246-12373 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
|
|

252-19373 viewsBetween Pelican and Possum sidings, bridge at the 220.6 km. Location is roughly here.
|
|

210510 1101373 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 019 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

253-17373 viewsPort Hedland harbour sees the suction / cutter dredge Vlaanderen XI with IMO #7712080. The Vlaanderen XI was originally built in 1978 by IHC Dredgers with yard number 1108 and originally named New Amsterdam, named the Vlaanderen XI in 1986, renamed again in 2007 to Kaveri and again to Huta 15 in 2014.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
760 |  |
 |
 |
 |
 |
 |
 |
|