Most viewed |

250501 0312339 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2141 - GA 2142, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0421339 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2111 - GA 2112, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

100731 02350338 viewsWO type iron ore waggon WO 31209 is leader of a batch of sixty two built by Goninan WA between April and August 2000 with serial number 950086-001 and fleet number 105 for Koolyanobbing iron ore operations, and is a Goninan built replacement WO type waggon with a build date of 05/2000, this replaces the original WAGR built WO type waggon with a WOD type with square features opposed to the curved ones as on the original WO, on loaded train 6413 at Binduli Triangle, 31st July 2010.
|
|

100731 02385338 viewsWOE type iron ore waggon WOE 31062 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-052 and fleet number 648 for Koolyanobbing iron ore operations, on loaded train 6413 at Binduli Triangle, 31st July 2010.
|
|

100731 03154338 viewsWOE type iron ore waggon WOE 33374 is one of a batch of one hundred and forty one built by United Goninan WA between November 2005 and April 2006 with serial number 950142-079 and fleet number 873 for Koolyanobbing iron ore operations, with a build date of 02/2006 and a revised load of 82.5 tonnes, empty train arriving at Binduli Triangle, 31st July 2010.
|
|

130703 0145338 viewsMurdinga, HCN type bogie grain hopper waggon HCN 4, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
|
|

130703 0168338 viewsMurdinga, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of two originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513, fitted with dynamic brakes, started working on the Eyre Peninsula in November 2004.
|
|

130703 0191338 viewsTooligie, view of Ascom Jumbo silo complex with the elevator structure and covers over the dual truck unloading grates. 3rd July 2013.
|
|

130703 0284338 viewsKaldow, HAN type bogie grain hopper waggon HAN 29, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130705 0599338 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.
|
|

130705 0624338 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

PD 9986338 viewsWest Kalgoorlie, side view from above of UGL Rail built WOE type iron ore waggon WOE 33654, fleet number 7065.
|
|

226-14338 viewsShaw North, 216.5 km, expanded view with arrival signal SWN 3 Shaw North 3 which is at the top of the steep 1.5 percent climb that south bound empties face. Dragging equipment detection bars visible, they are painted yellow and the interlocking room with the north end points and the departure signals and repeater posts due to the large curve loaded trains face. GeoData.
|
|

229-19338 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
|
|

231-30338 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
|
|

160523 3586338 viewsBinduli, nickel concentrate train 2438, WNB type pneumatic discharge nickel concentrate waggon WNB 545, one of six built by Bluebird Rail Services SA in 2010 for BHP Billiton.
|
|

060529 4719338 viewsParkeston, South Spur Rail AVDP type crew accommodation coach AVDP 277, built for the Commonwealth Railways by Comeng NSW as a brake van with sleeping accommodation as HRD type HRD 277 in 1971, modified for relay working in 1977, recoded to AVDY in 1983, then in 2002 leased for MurrayLander service before being sold to South Spur Rail and in this livery from mid 2005.
|
|

161116 5136338 viewsWest Kalgoorlie, Shell fuel train 3442, departmental wheel set carrier waggon AZVY 2829, built by Transfield WA 1976 for Commonwealth Railways as one of two hundred GOX type open waggons. Recoded to AOOX, then in 1992 modified to AZVY.
|
|

051001 5735338 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #22, 6213, builders plate detail, a Comeng WA built flat waggon in February 1977 under order no. 07-M-282 RY.
|
|

050421 1145338 viewsGillam Siding backtrack, BHP's ballast regulator BR 31 a Plasser Australia SSP 110SW model serial 401, over view. 21st April 2005.
|
|
| 19088 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
760 |  |
 |
 |
 |
 |
 |
 |
|