Most viewed |

252-37340 viewsBoodarie, a loaded Yarrie train is approaching the yard behind Goninan CM40-8M GE rebuild unit 5645 'Sherlock' serial number 8281-11 / 92-134. Early December 2001.
|
|

253-36340 viewsNelson Point hard stand area, riveted flat waggon 202 with three water tanks fitted, view of handbrake end, originally part of the 'camp train', modified by Mt Newman Mining railway workshops.
|
|

254-17340 viewsFlash Butt yard, stored Mt Newman Mining 5499 was the last active ALCo on the BHP roster. Built in November 1975 by Comeng NSW as an ALCo M636 model with serial number C6065-4. Unit was donated to Rail Heritage WA in 2001.
|
|

255-32340 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425, 9410, 9420 and 9414 with serial number 8206-11 / 91-124. The Western Creek interconnecting line can be seen branching off to the right. Geodata location here. May 2002.
|
|

190129 4241340 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00005 built by CSR Yangtze Co China serial 2014/382-5 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 4315340 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00072 built by CSR Yangtze Co China serial 2014/382-72 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

140601 4479340 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7772 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|

140601 4635340 viewsMidland, loaded iron ore train #1030 heading to Kwinana, CFCLA leased CHEY type waggon CHEY 8010 one pair of 120 bar coupled pairs built by Bluebird Rail Operations SA in 2011-12. 1st June 2014.
|
|

131024 IMG 0659340 viewsWest Kalgoorlie, detail image of AZWY 30373 'Sputnik' loco oil and sand waggon. Peter Donaghy image.
|
|

141028 IMG 3274340 viewsWest Kalgoorlie, NTAY type fuel tank waggon NTAY 5455 with 62,000 litre capacity for BP. Refurbished by Gemco WA in June 2014 from ex Mobil Oil NTAF type tank waggon NTAF 5455. In BP Oil ownership. I think this is an Indeng Qld built NTAF 455 the final of seven such tanks built for Mobil of NSW in 1981. Peter Donaghy image.
|
|

150326 IMG 4335340 viewsWest Kalgoorlie, AZAY type waste oil waggon AZAY 23439, detail image, this waggon usually operates between Merredin Loco and Forrestfield, not normally seen here in the Goldfields. Peter Donaghy image.
|
|

190107 0672340 viewsKalgoorlie, WN 519, pneumatic discharge nickel concentrate waggon, one of thirty units built by AE Goodwin NSW as WN type in 1970 for WMC.
|
|

160409 IMG 7036340 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160409 IMG 7160340 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160409 IMG 7196340 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160412 IMG 7361340 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160412 IMG 7365340 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160412 IMG 7401340 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

231020 8201340 viewsParkeston, QQYY type 40' container waggon QQYY 57711 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000344 with Tronox decal and CRM 001121 with Cristal decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|

231020 8236340 viewsParkeston, QQYY type 40' container waggon QQYY 57914 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000469 with Tronox decal and yellow corner posts and CRM 000882 with Cristal decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|
| 19088 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
756 |  |
 |
 |
 |
 |
 |
 |
|