Most viewed |

130704 0469340 viewsKyancutta, HCN type leader bogie grain hopper waggon HCN 1, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
|
|

100731 3235340 viewsBinduli, AQHY 30016 with sulphuric acid tank CSA 0006, originally built by the WAGR Midland Workshops in 1964/66 at WF type flat waggons, then following several codes and modifications in 1997 seventy five were converted to WQH to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana.
|
|

226-30340 viewsShaw siding, the loaded train heading north behind two Goninan CM40-8M GE rebuild units with loaded Comeng WA built waggons and a couple of the smooth sided experimental Comeng waggons. GeoData.
|
|

233-08340 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

235-26340 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5639 'Corunna Downs' serial 8281-03 / 92-128 sits on a loaded train as second unit awaiting departure time. Note the fuel tank and air receiver unit that tells it was an AE Goodwin built C636 ALCo before rebuild.
|
|

236-21340 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's General Electric built AC6000 unit 6072 'Hesta' serial 51064 is having the new windscreen protectors or 'blinkers' fitted.
|
|

160525 4803340 viewsWest Kalgoorlie, AQHY 30053 with sulphuric acid tank CSA 0095, originally built by WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana, part of empty acid train 4405 departing in the yard. CSA 0095 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions in 2015.
|
|

160527 5485340 viewsParkeston, loaded lime and cement shunt train 2C71 from West Kalgoorlie to Parkeston for Cockburn Lime. APNY 31153, one of twelve built by WAGR Midland Workshops in 1974 as WNA type pneumatic discharge nickel concentrate waggon, WAGR built and owned copies of the AE Goodwin built WN waggons for WMC.
|
|

160528 8366340 viewsParkeston, near the quarantine station, stored former Mobil Oil NSW NTAF waggons, from left: NTAF 5454, 5451, 5450, 5453 and 5449. I think these are Indeng Qld built NTAF waggons from a batch of seven such tanks built for Mobil of NSW in 1981 and numbered NTAF 449 to 455.
|
|

050518 2176340 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 512, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

051001 5622340 viewsFlash Butt yard, BHP flat waggon 6705 with EDI decal and ROA code of AQPY 2916, 55 tonne capacity, unsure of original owner, possible AN AOOX, then cut down to the Pilbara through CFCLA.
|
|

110411 09980340 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0010 from 1972, one of three such tank waggons.
|
|

150523 8209340 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0034, one of a second batch delivered in 2015 with safety slogan 'Think Safe + Work Safe = Go Home Safe'.
|
|

150619 9074340 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggons 0710, 0706 and 0713 await their next duty.
|
|

150620 9326340 viewsQuarry 8 ballast loading area, CNR-QRRS of China built 99 tonne ballast waggons 0209 and 0220 await loading.
|
|

160128 00340340 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0024, one of a batch of ten built in 2014.
|
|

110602 8648340 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here on the causeway just outside of 7 Mile. 2nd June 2011.
|
|

241-25340 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. June 2002.
|
|

080304 2207340 viewsThomas Yard, down the rail welding end, side view of slave waggon 1523, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

243-36340 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003. The view to the left is much changed as FMG now has five berths along with Roy Hill and BHP Harriet Point.
|
|
| 19088 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
755 |  |
 |
 |
 |
 |
 |
 |
|