Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
100731_03125.jpg
100731 03125341 viewsWOE type iron ore waggon WOE 31081 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-071 and fleet number 666 for Koolyanobbing iron ore operations, empty train arriving at Binduli Triangle, 31st July 2010.
100822_5938.jpg
100822 5938341 viewsWO type iron ore waggon WO 31271 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 153 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle 22nd August 2010. This unit was converted to WOS superphosphate in the late 1980s till 1994 when it was re-classed back to WO.
100822_5962.jpg
100822 5962341 viewsWOE type iron ore waggon WOE 33578 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-118 and fleet number 9080 for Koolyanobbing iron ore operations, Binduli Triangle 22nd August 2010.
100822_5981.jpg
100822 5981341 viewsWOE type iron ore waggon WOE 33382 is one of a batch of one hundred and forty one built by United Group Rail WA between November 2005 and April 2006 with serial number 950142-087 and fleet number 881 for Koolyanobbing iron ore operations, Binduli Triangle 22nd August 2010.
100822_6011.jpg
100822 6011341 viewsWOE type iron ore waggon WOE 33527 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-067 and fleet number 9019 for Koolyanobbing iron ore operations, Binduli Triangle 22nd August 2010.
100822_6018.jpg
100822 6018341 viewsWOE type iron ore waggon WOE 33560 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-100 and fleet number 9050 for Koolyanobbing iron ore operations, Binduli Triangle 22nd August 2010.
100822_6213.jpg
100822 6213341 viewsWOE type iron ore waggon WOE 33301 is one of a batch of one hundred and forty one built by United Goninan WA between November 2005 and April 2006 with serial number 950142-006 and fleet number 800 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
100822_6257.jpg
100822 6257341 viewsWOA type iron ore waggon WOA 31334 is one of a batch of thirty nine built by WAGR Midland Workshops between 1970 and 1971 with fleet number 214 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on empty train 1416 at Hampton, 22nd August 2010.
100822_6261.jpg
100822 6261341 viewsWOA type iron ore waggon WOA 31339 is one of a batch of thirty nine built by WAGR Midland Workshops between 1970 and 1971 with fleet number 217 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on empty train 1416 at Hampton, 22nd August 2010.
100822_6272.jpg
100822 6272341 viewsWO type iron ore waggon WO 31281 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 161 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on empty train 1416 at Hampton, 22nd August 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
100822_6285.jpg
100822 6285341 viewsWOE type iron ore waggon WOE 33526 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-066 and fleet number 9014 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
130703_0150.jpg
130703 0150341 viewsMurdinga, view looking north at the eight cell concrete silo complex built by SACBH with the Ascom silo visible behind and train being loaded in the siding. Geo location. 3rd July 2013.
130703_0171.jpg
130703 0171341 viewsMurdinga, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of two originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513, fitted with dynamic brakes, started working on the Eyre Peninsula in November 2004.
130703_0253.jpg
130703 0253341 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
130705_0545.jpg
130705 0545341 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0600.jpg
130705 0600341 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.
130705_0621.jpg
130705 0621341 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
231-20.jpg
231-20341 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
232-23.jpg
232-23341 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.
233-27.jpg
233-27341 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
19088 files on 955 page(s) 751

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional