Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
100731_02828.jpg
100731 02828378 viewsWOE type iron ore waggon WOE 33439 is one of a batch of seventeen built by United Group Rail WA between July and August 2008 with serial number 950209-003 and fleet number 8940 for Koolyanobbing iron ore operations, on loaded train 7415 at Binduli Triangle, 31st July 2010.
100731_02872.jpg
100731 02872378 viewsWOE type iron ore waggon WOE 33528 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-068 and fleet number 9018 for Koolyanobbing iron ore operations, on loaded train 7415 at Binduli Triangle, 31st July 2010.
100731_02901.jpg
100731 02901378 viewsWOE type iron ore waggon WOE 33481 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-023 and fleet number 8975 for Koolyanobbing iron ore operations, on loaded train 7415 at Binduli Triangle, 31st July 2010.
100731_03064.jpg
100731 03064378 viewsWOC type iron ore waggon WOC 31358 is one of a batch of thirty built by Goninan WA between October 1997 to January 1998 with fleet number 418 for Koolyanobbing iron ore operations with a 75 ton capacity and lettered for KIPL, Koolyanobbing Iron Pty Ltd which has had KIPL painted over, empty train arriving at Binduli Triangle, 31st July 2010.
100731_03065.jpg
100731 03065378 viewsWOC type iron ore waggon WOC 31346 is one of a batch of thirty built by Goninan WA between October 1997 to January 1998 with fleet number 406 for Koolyanobbing iron ore operations with a 75 ton capacity and lettered for KIPL, Koolyanobbing Iron Pty Ltd which has had KIPL painted over, empty train arriving at Binduli Triangle, 31st July 2010.
100731_03071.jpg
100731 03071378 viewsWO type iron ore waggon WO 31208 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 104 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, empty train arriving at Binduli Triangle, 31st July 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
100731_03140.jpg
100731 03140378 viewsWO type iron ore waggon WO 31284 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 164 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, empty train arriving at Binduli Triangle, 31st July 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
100822_5872.jpg
100822 5872378 viewsWOE type iron ore waggon WOE 30256 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-006 and fleet number 606 for Koolyanobbing iron ore operations, Binduli Triangle 22nd August 2010.
100822_5981.jpg
100822 5981378 viewsWOE type iron ore waggon WOE 33382 is one of a batch of one hundred and forty one built by United Group Rail WA between November 2005 and April 2006 with serial number 950142-087 and fleet number 881 for Koolyanobbing iron ore operations, Binduli Triangle 22nd August 2010.
100822_6213.jpg
100822 6213378 viewsWOE type iron ore waggon WOE 33301 is one of a batch of one hundred and forty one built by United Goninan WA between November 2005 and April 2006 with serial number 950142-006 and fleet number 800 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
100822_6220.jpg
100822 6220378 viewsWOE type iron ore waggon WOE 33378 is one of a batch of one hundred and forty one built by United Goninan WA between November 2005 and April 2006 with serial number 950142-083 and fleet number 877 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
100822_6231.jpg
100822 6231378 viewsWOD type iron ore waggon WOD 31443 is one of a batch of sixty two built by Goninan WA between April and August 2000 with serial number 950086-016 and fleet number 506 for Koolyanobbing iron ore operations, build date 05/2000, with a 75 ton capacity, for Portman Mining to cart their Koolyanobbing iron ore to Esperance, now with PORTMAN painted out, on empty train 1416 at Hampton, 22nd August 2010.
100822_6261.jpg
100822 6261378 viewsWOA type iron ore waggon WOA 31339 is one of a batch of thirty nine built by WAGR Midland Workshops between 1970 and 1971 with fleet number 217 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on empty train 1416 at Hampton, 22nd August 2010.
100822_6301.jpg
100822 6301378 viewsWOE type iron ore waggon WOE 33557 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-097 and fleet number 9052 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
100822_6305.jpg
100822 6305378 viewsWOE type iron ore waggon WOE 33326 is one of a batch of one hundred and forty one built by United Goninan WA between November 2005 and April 2006 with serial number 950142-031 and fleet number 825 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
100822_6322.jpg
100822 6322378 viewsWOE type iron ore waggon WOE 31059 is one of a batch of fifteen built by Goninan WA between April and May 2002 with fleet number 645 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
060531_5021.jpg
060531 5021378 viewsWest Kalgoorlie, AOPY 32376, fleet number 919, one of seventy ex ANR coal waggons rebuilt from AOKF type by Bluebird Engineering SA in service with ARG on Koolyanobbing iron ore trains. They used to be three metres longer and originally built by Metropolitan Cammell Britain as GB type in 1952-55, 31st May 2006.
130703_0150.jpg
130703 0150378 viewsMurdinga, view looking north at the eight cell concrete silo complex built by SACBH with the Ascom silo visible behind and train being loaded in the siding. Geo location. 3rd July 2013.
130703_0152.jpg
130703 0152378 viewsMurdinga, view looking north at the eight cell concrete silo complex built by SACBH with the Ascom silo visible behind and train being loaded in the siding. Geo location. 3rd July 2013.
130703_0249.jpg
130703 0249378 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
19220 files on 961 page(s) 745

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional