Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
231020_8211.jpg
231020 8211383 viewsParkeston, QQYY type 40' container waggon QQYY 57863 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 001726 with Cristal decal and yellow corner posts and CRM 000768 with Tronox decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
231020_8221.jpg
231020 8221383 viewsParkeston, QQYY type 40' container waggon QQYY 58159 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000364 with Tronox decal and yellow corner posts and CRM 000472 with Tronox decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
240701_2726.jpg
240701 2726383 viewsPilbara Railways Historical Society, view along the passenger carriages, closest is the 'Conference Car' with SV 4 still visible, originally built by Clyde Engineering at Granville NSW in 1935 for the NSWGR as a second class railway carriage FS type FS 2010. In 1975 it was purchased by Hamersley Iron and converted to an inspection vehicle SV 4. When donated to the Society it was repurposed as a conference car. July 1, 2024.
240701_2749.jpg
240701 2749383 viewsPilbara Railways Historical Society, passenger carriage 'Fortescue' was originally built by Clyde Engineering at Granville NSW in 1936 for the NSWGR as a second class railway carriage FS type FS 2141. In 1975 it was purchased by the Society and is named after a local river. July 1, 2024.
250501_0421.jpg
250501 0421383 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2111 - GA 2112, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
100731_02283.jpg
100731 02283382 viewsWOE type iron ore waggon WOE 31125 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-115 and fleet number 707 for Koolyanobbing iron ore operations, on loaded train 6413 at Binduli Triangle, 31st July 2010.
100731_02829.jpg
100731 02829382 viewsWOE type iron ore waggon WOE 33440 is one of a batch of seventeen built by United Group Rail WA between July and August 2008 with serial number 950209-004 and fleet number 8938 for Koolyanobbing iron ore operations, on loaded train 7415 at Binduli Triangle, 31st July 2010.
100731_02867.jpg
100731 02867382 viewsWOE type iron ore waggon WOE 31068 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-058 and fleet number 654 for Koolyanobbing iron ore operations, on loaded train 7415 at Binduli Triangle, 31st July 2010.
100731_02902.jpg
100731 02902382 viewsWOE type iron ore waggon WOE 33322 is one of a batch of one hundred and forty one built by United Goninan WA between November 2005 and April 2006 with serial number 950142-027 and fleet number 821 for Koolyanobbing iron ore operations, on loaded train 7415 at Binduli Triangle, 31st July 2010.
100731_03131.jpg
100731 03131382 viewsWOE type iron ore waggon WOE 31104 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-094 and fleet number 688 for Koolyanobbing iron ore operations, empty train arriving at Binduli Triangle, 31st July 2010.
100822_5952.jpg
100822 5952382 viewsWO type iron ore waggon WO 31212 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 108 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle 22nd August 2010. This unit was converted to WOS superphosphate in the late 1980s till 1994 when it was re-classed back to WO.
100822_6250.jpg
100822 6250382 viewsWOE type iron ore waggon WOE 33462 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-004 and fleet number 8967 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
100822_6321.jpg
100822 6321382 viewsWOE type iron ore waggon WOE 30293 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-043 and fleet number 635 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
060111_2340.jpg
060111 2340382 viewsKyancutta, the concrete and steel silo complexes frame ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 as it leads a north bound empty grain train. 11th January 2006.
130703_0165.jpg
130703 0165382 viewsMurdinga, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of two originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513, fitted with dynamic brakes, started working on the Eyre Peninsula in November 2004.
130705_0537.jpg
130705 0537382 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0602.jpg
130705 0602382 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.
100731_3222.jpg
100731 3222382 viewsBinduli, AQHY 30026 with sulphuric acid tank CSA 0058, originally built by the WAGR Midland Workshops in 1964/66 at WF type flat waggons, then following several codes and modifications in 1997 seventy five were converted to WQH to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana.
100731_3226.jpg
100731 3226382 viewsBinduli, AQHY 30055 with sulphuric acid tank CSA 0066, originally built by the WAGR Midland Workshops in 1964/66 at WF type flat waggons, then following several codes and modifications in 1997 seventy five were converted to WQH to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana.
221-21.jpg
221-21382 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible and the plant stacker can been seen at the very top of the stockpile.
19220 files on 961 page(s) 731

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional