Most viewed |

100822 6001348 viewsWOE type iron ore waggon WOE 33237 is one of a batch of twenty seven built by Goninan WA between September and October 2002 with serial number and fleet number 736 for Koolyanobbing iron ore operations, Binduli Triangle 22nd August 2010.
|
|

100822 6241348 viewsWOE type iron ore waggon WOE 33403 is one of a batch of one hundred and forty one built by United Group Rail WA between November 2005 and April 2006 with serial number 950142-108 and fleet number 8902 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
|
|

100822 6305348 viewsWOE type iron ore waggon WOE 33326 is one of a batch of one hundred and forty one built by United Goninan WA between November 2005 and April 2006 with serial number 950142-031 and fleet number 825 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
|
|

130705 0590348 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1.
|
|

130705 0591348 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1.
|
|

130705 0609348 viewsLock, up end looking down through Lock, Ascom silo block #5 on the left, Viterra fast loader loading train while loaded portion sits on the mainline.
|
|

222-26348 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7073 serial 47752 a General Electric Dash 9-44CW built by GE at Erie with 7091 has stopped for a crew change besides a loaded headed up by 7071.
|
|

222-36348 viewsSomewhere on the original single line section between Gull and Rosella a pair of Hamersley Iron General Electric Dash 9-44CW's built by GE at Erie power a loaded train towards Dampier from the passing track back onto the mainline following a crew change.
|
|

224-24348 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south with sister unit 6073 as a loaded behind two CM40-8M units rolls through on the mainline. GeoData.
|
|

226-21348 viewsShaw siding back track at the 219 km, Speno RR 24 M-1 rail grinder stabled in back track. GeoData.
|
|

233-03348 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train can be seen about to enter the tunnel. GeoData.
|
|

233-37348 viewsYandi Two, BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5634 'Boodarie' serial 8151-07 / 91-120 shows the ALCo heritage from the frame down and is wearing the teal and marigold logo. 5634 was the first CM40-8M rebuild for BHP. GeoData.
|
|

234-28348 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. Cab front on view. Circa 1998.
|
|

235-17348 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 leads the afternoon 240 waggon train with second unit Goninan built CM39-8 unit 5630 'Zeus' as the exit the loadout tunnel, notice the fuel tank differences between the lead unit an ALCo rebuild and the second unit built new.
|
|

236-24348 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention, with AC6000 units 6072 being driven out and 6077 beside it.
|
|

160525 4837348 viewsWest Kalgoorlie, ATPF 576 fuel tanker, one of nine built by WAGR Midland Workshops in 1974 for Shell, with a capacity now of 80,000 litres.
|
|

050319 0142348 viewsNelson Point, rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
|
|

050421 1386348 viewsQuarry 8, Magor USA built ballast waggon 513, originally built in 1963 for the Oroville Dam project, before coming to BHP second hand as a ballast waggon in January 1968.
|
|

050518 2100348 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 748.
|
|

050518 2115348 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 746, rear view.
|
|
| 19088 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
730 |  |
 |
 |
 |
 |
 |
 |
|