Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
050412_0759.jpg
050412 0759351 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 520.
050518_2156.jpg
050518 2156351 viewsBing Siding. Side view of 1963 built Magor USA waggon 537, originally in ore service before conversion to a ballast waggon.
050518_2158.jpg
050518 2158351 viewsBing Siding. Side view of 1963 built Magor USA waggon 501, the first of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
051001_5726.jpg
051001 5726351 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #28, 2nd lead off waggon 6201, builders plate, built by Comeng WA in January 1977 under order no. 07-M-282 RY.
060429_3755.jpg
060429 3755351 viewsFlash Butt yard, Pony re-laying waggon 6704 special flat waggon on the left coupled to a former Goldsworthy Mining 55 tonnes flat waggon built by Tomlinson Steel from 1966.
060501_3892.jpg
060501 3892351 viewsTabba Siding, ballast plough waggon converted from Magor USA built Oroville ore waggon 538, still visible is the ODCX 82160 number from original service building the Oroville Dam.
060714_6817.jpg
060714 6817351 viewsHesta Siding, rail recovery and transport train flat waggon #30, 6702, heavily cut down and modified Magor USA ore waggon by Mt Newman Mining workshops, converted to a 50 tonne flat waggon and designated the winch waggon with generator set to power the winch and the crib car.
050414_0946.jpg
050414 0946351 viewsFlash Butt yard, Speno Australia's RR24 model 24 stone rail grinder serial M20 before it had id stickers fitted, this unit was later stickered as RG 1, view of the generator and driving module. 14th April 2005.
060501_3913.jpg
060501 3913351 viewsAbydos Siding backtrack, Speno rail grinder RG 2, third grinding module and driving cab. 1st May 2006.
100717_0680.jpg
100717 0680351 viewsFlash Butt yard, new rail stock carrier waggon 6024, built by Gemco Rail in late 2009-10 with Barber bogies.
100717_0684.jpg
100717 0684351 viewsFlash Butt yard, new rail stock carrier waggon 6037, built by Gemco Rail in late 2009-10 with Barber bogies.
100717_0685.jpg
100717 0685351 viewsFlash Butt yard, new rail stock carrier waggon 6045, built by Gemco Rail in late 2009-10 with Barber bogies.
110411_09993.jpg
110411 09993351 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0003 one of six such tank waggons built in 1970-71.
110606_1750.jpg
110606 1750351 viewsFlash Butt yard, CNR-QRRS of China built side dump waggon, built and delivered in early 2011, waggon 0711 awaits the call to duty.
150314_7742.jpg
150314 7742351 viewsBing Siding, fuel tank waggon 0019 82 kL capacity, built by Comeng for BP as RTC 1, first of two such tanks, used on Mt Newman line, unsure when converted to 0019.
150619_9078.jpg
150619 9078351 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0706 loaded with fines for sheeting.
249-13.jpg
249-13351 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
255-37.jpg
255-37351 viewsEmu Siding on the Hamersley Iron Dampier to Tom Price line with the Western Creek Robe River interconnecting line joining the East Mainline, the mileage is 76.3 km on the Robe and 78.4 on the HI. The interconnecting line branches off the Robe River Cape Lambert to Deepdale line at the 71.1 km. Geodata location here. May 2002.
190129_4243.jpg
190129 4243351 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00067 built by CSR Yangtze Co China serial 2014/382-67 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190129_4259.jpg
190129 4259351 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00326 built by CSR Yangtze Co China serial 2014/382-326 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
19088 files on 955 page(s) 720

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional