Most viewed |

247-25388 viewsCape Lambert overview of the fuel point, with a brace of four Goninan WA CM40-8M GE rebuilds finishing up refuelling before departing with another empty train as a loaded rake is dragged to the dumper behind them. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.
|
|

251-07388 viewsNelson Point, BHP's recently retired Goninan WA ALCo C636 to GE C36-7M rebuild unit 5507 builders plate. 22nd April 2000.
|
|

251-23388 viewsNelson Point hard stand area, BHP's 5631 'Apollo' built new in October 1988 by Goninan as a GE CM39-8 model with serial number 5831-10 / 88-080. One of four such units built in 1988 and delivered in the Mt Newman orange livery. 22nd April 2000.
|
|

252-16388 viewsRosella Junction looking south at the 251 km. The line to the left goes to Marandoo and Yandicoogina, the straight to Tom Price and Paraburdoo and the right heads to Brockman. Location is roughly here. 24th November 2001.
|
|

210322 9573388 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 074 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
|
|

253-34388 viewsNelson Point hard stand area, riveted flat waggon 202 with three water tanks fitted, view of handbrake end, originally part of the 'camp train', modified by Mt Newman Mining railway workshops.
|
|

254-25388 viewsBing Siding, an empty train departs behind 6071 an General Electric built AC6000 model with serial number 51063. The locomotive has not yet been named. September 2001.
|
|

256-33388 viewsAt the 89.6 km grade crossing the loaded train behind the quad CM40-8M working of 9414, 9420, 9410 and 9425 rolls across the crossing and heads down the 1.26 percent grade. 9414 was built by AE Goodwin NSW as an ALCo M636 model in December 1971 with serial number G-6060-5 and part of the original order for five units. Locomotive was delivered to Robe River in January 1972 with Bechtel Pacific road umber 262.005 for construction use and was renumbered 1714 when that was completed. 9414 was rebuilt by Goninan WA in November 1991 to become an CM40-8M model with serial number 8206-11 / 91-124. May 2002.
|
|

257-23388 viewsGoldsworthy Junction, an empty train runs between the junction and the Broome Rd crossing behind the standard single locomotive 5646 'White Springs', a Goninan 1992 built GE CM40-8 model with serial number 5244-11 / 92-135. Late 2001.
|
|

245-28388 viewsYaninee, trailing view of an empty grain train as it trundles over Hunt Terrace with its motely collection of grain waggons as it runs 'express' through Yaninee. 7th April, 2003.
|
|

190129 4237388 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00054 built by CSR Yangtze Co China serial 2014/382-54 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 4241388 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00005 built by CSR Yangtze Co China serial 2014/382-5 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 4344388 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00221 built by CSR Yangtze Co China serial 2014/382-221 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

268-11388 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

140406 IMG 1934388 viewsWest Kalgoorlie, NTBF 6119 fuel tank waggon detail image, originally built by Comeng NSW in 1975 as SCA type SCA 270 a 69,000 litre bitumen tank waggon for Shell NSW, diesel capacity of 62700 litres. Peter Donaghy image.
|
|

190108 1303388 viewsWest Kalgoorlie, ATPY 588 fuel tank waggon, built by Westrail Midland Workshops in 1979 for Mobil as WJP type 80,000 litre single compartment and dome, recoded to WJPY, sold to BP Oil in 1985. Gemco WA refurbished November 2016, and now a 80,375 litre maximum capacity.
|
|

160409 IMG 7187388 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160409 IMG 7217388 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160409 IMG 7267388 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160412 IMG 7435388 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
716 |  |
 |
 |
 |
 |
 |
 |
|