Most viewed |

050421 1625356 viewsHesta Siding backtrack, Speno Australia's two 24 stone rail grinders coupled together before they had id stickers fitted, the front unit was later stickered as RG 2, the rear unit was stickered as RG 1 and is serial M20. 21st April 2005.
|
|

050801 4762356 viewsFlash Butt yard, Barclay Mowlem ballast regulator. 1st August 2005.
|
|

050801 4773356 viewsIn the Flash Butt yard a line up of Barclay Mowlem track machines from the closest to the camera, tamper, regulator, regulator, tamper, clip installer, tamper then BHP's mainline tamper. 1st August 2005.
|
|

081217 0454356 viewsWoodstock Siding, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6105 in service with the rail recovery and transport train as waggon #2.
|
|

081217 0456356 viewsWoodstock Siding, rail recovery and transport train flat waggon #1, rear lead off waggon 6203, built by Comeng WA in January 1977 under order number 07-M-282 RY. The straddle crane is a newish unit built by Vaia Car model no. TCR-V and the four wheels are chain driven, replacing the original Gemco hydraulic unit.
|
|

100717 0675356 viewsFlash Butt yard, new rail stock carrier waggon 6043, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

110411 09983356 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0002 from 1970, one of two water tank waggons, later converted to a weed spray tanker in 1977, then converted to fuel.
|
|

150523 8223356 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0037, one of a second batch delivered in 2015 with safety slogan 'Safety is a core value'.
|
|

243-17356 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
|
|

248-13356 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 7077 serial 47756 from the original first order in the Pepsi Can livery and 9408 serial 54158 from the fourth order in the Pilbara Rail livery with Robe ownership markings powers away to the south with the signal marker boards are in the distance. Approximate location. 24th April 2004.
|
|

252-13356 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, General Electric built 9-44CW unit 7087 with serial number 47766 from the original 1994 build idles away on the western end of the ballast train. Cab side view. Location is roughly here. 24th November 2001.
|
|

256-34356 viewsAt the 89.6 km grade crossing the loaded train behind the quad CM40-8M working of 9414, 9420, 9410 and 9425 rolls across the crossing and heads down the 1.26 percent grade. 9414 was built by AE Goodwin NSW as an ALCo M636 model in December 1971 with serial number G-6060-5 and part of the original order for five units. Locomotive was delivered to Robe River in January 1972 with Bechtel Pacific road umber 262.005 for construction use and was renumbered 1714 when that was completed. 9414 was rebuilt by Goninan WA in November 1991 to become an CM40-8M model with serial number 8206-11 / 91-124. May 2002.
|
|

190129 4282356 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00101 built by CSR Yangtze Co China serial 2014/382-101 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 4316356 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00083 built by CSR Yangtze Co China serial 2014/382-83 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

140601 4467356 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7764 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|

140601 4625356 viewsMidland, loaded iron ore train #1030 heading to Kwinana, CFCLA leased CHEY type waggon CHEY 8017 one pair of 120 bar coupled pairs built by Bluebird Rail Operations SA in 2011-12. 1st June 2014.
|
|

268-35356 viewsAt the 39 km detection site with the Alstom 25-year special, the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star, a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port. 12th of April 2002.
|
|

160708 iPh5S 2784356 viewsWittenoom, view looking south at the fog hanging over Mount Watkins and the Hammersley Range from 53 Fifth Avenue Wittenoom, taken at 3:15pm, 8th of July 2016. Geodata.
|
|

160710 iPh5S 2794356 viewsWittenoom Gorge, Colonial Mine, old build frame still standing along the north wall on the upper level.
|
|

160710 iPh5S 2802356 viewsWittenoom Gorge, Colonial Mine, view looking across the level to adits #28 and #27. Tailings fill has eroded, old track points or switches stacked up. Geodata.
|
|
| 19088 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
702 |  |
 |
 |
 |
 |
 |
 |
|