Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
040806_102052.jpg
040806 102052357 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of the removed deck showing chutes.
040814_091958.jpg
040814 091958357 viewsNelson Point, CFCLA ballast waggon CHQY type 730 just being delivered to BHP Iron Ore as part of the Rail PACE project, 3/4 view from handbrake end.
050704_3992.jpg
050704 3992357 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0014 from 1974-5, one of six such tank waggons.
051001_5690.jpg
051001 5690357 viewsBoodarie, the Steel Train or rail recovery and transport train, builders plate detail of flat waggon #14, 6207, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
050414_0939.jpg
050414 0939357 viewsFlash Butt yard, builders plate of Barclay Mowlem track tamper a Fairmont Jackson model 6700 tamper serial 153172. 14th April 2005.
050421_1143.jpg
050421 1143357 viewsGillam Siding backtrack, BHP's ballast regulator BR 31 a Plasser Australia SSP 110SW model serial 401, rear view. 21st April 2005.
050421_1611.jpg
050421 1611357 viewsHesta Siding backtrack, Speno Australia's 24 stone rail grinder before they had id stickers fitted, this front unit was later stickered as RG 2. 21st April 2005.
050421_1625.jpg
050421 1625357 viewsHesta Siding backtrack, Speno Australia's two 24 stone rail grinders coupled together before they had id stickers fitted, the front unit was later stickered as RG 2, the rear unit was stickered as RG 1 and is serial M20. 21st April 2005.
050625_3816.jpg
050625 3816357 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, a Barclay Mowlem sleeper inserter track machine off clear of the running lines. 25th June 2005.
050625_3817.jpg
050625 3817357 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, a Barclay Mowlem track lifter track machine off clear of the running lines. 25th June 2005.
081217_0456.jpg
081217 0456357 viewsWoodstock Siding, rail recovery and transport train flat waggon #1, rear lead off waggon 6203, built by Comeng WA in January 1977 under order number 07-M-282 RY. The straddle crane is a newish unit built by Vaia Car model no. TCR-V and the four wheels are chain driven, replacing the original Gemco hydraulic unit.
150523_8220.jpg
150523 8220357 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0043, one of a second batch delivered in 2015 with safety slogan 'ASAP - As safe as possible'.
150523_8223.jpg
150523 8223357 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0037, one of a second batch delivered in 2015 with safety slogan 'Safety is a core value'.
160128_00332.jpg
160128 00332357 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0026, one of a batch of ten built in 2014.
241-13.jpg
241-13357 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. This image shows the Dash 8 radiator frame fitted to it following collision repairs, sister unit 5506 and M636 unit 5499. June 2002.
080124_1632.jpg
080124 1632357 viewsChapman Siding, side view of slave waggon 1313, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
246-10.jpg
246-10357 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
249-16.jpg
249-16357 viewsTable Hill on the Robe River railway line, looking in a southerly direction as the railway line snakes south towards the Chichester's. Approximate location.
251-07.jpg
251-07357 viewsNelson Point, BHP's recently retired Goninan WA ALCo C636 to GE C36-7M rebuild unit 5507 builders plate. 22nd April 2000.
252-02.jpg
252-02357 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, ballast plough waggon BP 02 is on the end of a ballast rake being loaded. BP 02 has been converted from an Nippon Sharyo ore waggon with the mounting of an air compressor on top and the fitting of a plough blade, the waggon is also loaded with ballast to ballast the plough. Location is roughly here. 24th November 2001.
19088 files on 955 page(s) 698

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional