Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
100731_02824.jpg
100731 02824393 viewsWOE type iron ore waggon WOE 33499 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-039 and fleet number 9036 for Koolyanobbing iron ore operations, on loaded train 7415 at Binduli Triangle, 31st July 2010.
100731_02871.jpg
100731 02871393 viewsWOE type iron ore waggon WOE 33525 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-065 and fleet number 9038 for Koolyanobbing iron ore operations, on loaded train 7415 at Binduli Triangle, 31st July 2010.
100731_02918.jpg
100731 02918393 viewsWOE type iron ore waggon WOE 33545 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-085 and fleet number 9028 for Koolyanobbing iron ore operations, on loaded train 7415 at Binduli Triangle, 31st July 2010.
100731_03061.jpg
100731 03061393 viewsWOE type iron ore waggon WOE 33573 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-113 and fleet number 9074 for Koolyanobbing iron ore operations, empty train arriving at Binduli Triangle, 31st July 2010.
100731_03075.jpg
100731 03075393 viewsWO type iron ore waggon WO 31234 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 126 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, empty train arriving at Binduli Triangle, 31st July 2010. This unit was converted to WOS superphosphate in the late 1980s till 1994 when it was re-classed back to WO.
100731_03089.jpg
100731 03089393 viewsWOE type iron ore waggon WOE 31095 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-085 and fleet number 680 for Koolyanobbing iron ore operations, empty train arriving at Binduli Triangle, 31st July 2010.
100822_5945.jpg
100822 5945393 viewsWOE type iron ore waggon WOE 33327 is one of a batch of one hundred and forty one built by United Goninan WA between November 2005 and April 2006 with serial number 950142-032 and fleet number 826 for Koolyanobbing iron ore operations, Binduli Triangle 22nd August 2010.
100822_6211.jpg
100822 6211393 viewsWOE type iron ore waggon WOE 33333 is one of a batch of one hundred and forty one built by United Goninan WA between November 2005 and April 2006 with serial number 950142-038 and fleet number 832 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
100822_6323.jpg
100822 6323393 viewsWOE type iron ore waggon WOE 31077 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-067 and fleet number 662 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
060113_2548.jpg
060113 2548393 viewsKevin, narrow gauge locos 1604, NJ 3 and 1601 take the mainline to Thevenard, having reversed train 6DD3 on the Kevin triangle as they prepare to load, 1600 class unit 1604 in Australian Railroad Group livery a Clyde Engineering built EMD JL22C model serial 71-731, originally built as NJ class NJ 4 and built for the Central Australia Railway in 1971, transferred to the Eyre Peninsula in 1981. 13th January 2006.
130703_0192.jpg
130703 0192393 viewsTooligie, a rake of loaded grain waggons of the HAN, HBN and HCN types awaits collection for the trip to Port Lincoln. 3rd July 2013.
130703_0264.jpg
130703 0264393 viewsKaldow, Port Lincoln bound loaded grain train crossing Loller Road grade crossing with EMD 1200 class 1204 leading two ALCo units, rebuilt 906 and 851. 3rd July 2013.
130703_0282.jpg
130703 0282393 viewsKaldow, HAN type bogie grain hopper waggon HAN 25, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130703_0304.jpg
130703 0304393 viewsKaldow, HAN type bogie grain hopper waggon HAN 61, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130704_0409.jpg
130704 0409393 viewsKyancutta, south bound loaded grain train has stopped here to collect a loaded rack of grain waggons, seen here backing up to re-join the rest of the train on the mainline as it crosses the Eyre Highway grade crossing, behind EMD 1204 and twin ALCo 830 units 873 and 851. 4th July 2013.
130704_0417.jpg
130704 0417393 viewsKyancutta, south bound loaded grain train has stopped here to collect a loaded rack of grain waggons, seen here backing up to re-join the rest of the train on the mainline with one of only three electric signals on the network which a sharp eye might notice has turned red as the grade crossing protection has timed out, behind EMD 1204 and twin ALCo 830 units 873 and 851. 4th July 2013.
130704_0433.jpg
130704 0433393 viewsKyancutta, 1200 class unit 1204 wearing current owner Genesee & Wyoming livery is a Clyde Engineering built EMD G12C model with serial 65-428 heads up a loaded grain train as it undertakes a brake test following shunting to attach a further fourteen waggons. 4th July 2013.
130704_0461.jpg
130704 0461393 viewsKyancutta, HAN type bogie grain hopper waggon HAN 23, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130704_0486.jpg
130704 0486393 viewsMoule, Mallee style shelter shed as a station 'building' of sorts. Moule was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. It hosts a crossing loop and ballast loading siding, Location is here. 4th July 2013.
130705_0539.jpg
130705 0539393 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
19220 files on 961 page(s) 696

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional