Most viewed |

130703 0275394 viewsKaldow, HCN type bogie grain hopper waggon HCN 4, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
|
|

130703 0278394 viewsKaldow, HAN type bogie grain hopper waggon HAN 47, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130704 0420394 viewsKyancutta, south bound loaded grain train has stopped here to collect a loaded rack of grain waggons, seen here backing up to re-join the rest of the train on the mainline with one of only three electric signals on the network, behind EMD 1204 and twin ALCo 830 units 873 and 851. 4th July 2013.
|
|

130704 0431394 viewsKyancutta, 1200 class unit 1204 wearing current owner Genesee & Wyoming livery is a Clyde Engineering built EMD G12C model with serial 65-428 heads up a loaded grain train as it undertakes a brake test following shunting to attach a further fourteen waggons. 4th July 2013.
|
|

130704 0453394 viewsKyancutta, HAN type bogie grain hopper waggon HAN 46, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130704 0458394 viewsKyancutta, HAN type bogie grain hopper waggon HAN 24, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130704 0488394 viewsMoule, yard overview looking east, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. From the left is the end of the ballast siding with the crossing loop rejoining the mainline just before the grade crossing to access the ballast stockpile area. Location is here. 4th July 2013.
|
|

130708 0748394 viewsCharra, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 60 N, without hungry boards loaded with gypsum, Charoban Rd grade crossing, 477.8 km.
|
|

130708 0870394 viewsThevenard, view of arriving loaded train from inside the yard.
|
|

060530 4922394 viewsParkeston, AHQF 31424 seen here in Loongana Limestone service, originally built by Goninan WA for Western Quarries as a batch of twenty coded WHA type in 1995. Purchased by Westrail in 1998.
|
|

100609 09986394 viewsMidland, AZDY 30733, one of about fourteen WBAX vans converted to AZDY type sodium cyanide container waggon, originally built by WAGR Midland Workshops as one of seventy five WV/X type covered vans in 1967-68, converted late 1988/9 to WQDF. Loaded here with two empty AGR sodium cyanide tanktainers SD 662 and SD 643.
|
|

100609 10016394 viewsMidland, AQCY 30208 container flat waggon built by WAGR Midland Workshops in a batch of forty five WFX type container flats in 1974, recoded to WQCX in 1980. Loaded with two 20' Mediterranean Shipping 22G1 type containers MSCU 238948 and MEDU 121916.
|
|

100611 0332394 viewsMidland, AQHY 30031 with sulphuric acid tank CSA 0034, originally built by the WAGR Midland Workshops in 1964/66 at WF type flat waggons, then following several codes and modifications in 1997 seventy five were converted to WQH to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana.
|
|

100611 0349394 viewsMidland, APKY 30642, one of two built by WAGR Midland Workshops in 1970 as WK type pneumatic discharge bulk cement waggon.
|
|

222-28394 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7073 serial 47752 a General Electric Dash 9-44CW built by GE at Erie with 7091 has stopped for a crew change besides a loaded headed up by 7071.
|
|

225-25394 viewsAt the 24.1 km grade crossing on the BHP Newman line the end of the afternoon Yandi train is seen heading south with last waggon 4305, one of 126 such waggons constructed during 1997 out of 3CR12 stainless steel in an effort to eliminate painting and to reduce wear on the waggon body. This design was designated HC7081. GeoData.
|
|

226-01394 viewsYule River bridge showing new piles and deck to replace flood damaged piles after a cyclone that closed the line for two weeks in the late 1990s. GeoData.
|
|

230-31394 viewsYandi Two balloon loop, two Goninan GE CM40-8M rebuilds back to back, 5637 on the right being an early rebuild has no marker lights and a snow plough while 5654 has maker lights and note the spare coupler knuckle mounted at the bottom of the steps. Geodata -22.718338, 119.039909 .
|
|

234-36394 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking across the YT315.8 km grade crossing and 5658 back to the ore stockpile at the loadout. Circa 1998.
|
|

236-25394 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention, with AC6000 units 6072 being driven out.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
693 |  |
 |
 |
 |
 |
 |
 |
|