Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
050801_4753.jpg
050801 4753401 viewsFlash Butt yard, Barclay Mowlem TM 21 a Plasser Australia 09-16 model tamper, shows original owner B & M Whitmore Pty Ltd. 1st August 2005.
051001_5668.jpg
051001 5668401 viewsFlash Butt yard, a newly delivered Knox Kershaw KBR 875 ballast regulator serial 015-875-05. 1st October 2005.
100717_0681.jpg
6033 Gemco WA 100717 0681401 viewsFlash Butt yard, new rail stock carrier waggon 6033, built by Gemco Rail in late 2009-10 with Barber bogies.
100717_0695.jpg
6027 Gemco WA 100717 0695401 viewsFlash Butt yard, new rail stock carrier waggon 6027, built by Gemco Rail in late 2009-10 as these waggons have Barber bogies and not Chinese castings, view of B end and handbrake and rail string support.
110411_09978.jpg
0010 Comeng NSW 110411 09978401 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0010 from 1972, one of three such tank waggons.
110411_09989.jpg
0005 Comeng NSW 110411 09989401 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0005 one of six such tank waggons built in 1970-71.
110411_09996.jpg
0012 Comeng NSW 110411 09996401 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0012 from 1972, one of three such tank waggons.
110411_10009.jpg
0011 Comeng NSW 110411 10009401 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0011 from 1972, one of three such tank waggons.
110411_10033.jpg
0004 Comeng NSW 110411 10033401 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71.
110619_1883.jpg
6202 Comeng WA 110619 1883401 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #13, 6202, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
150523_8213.jpg
0031 CNR - QRRS China 150523 8213401 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0031, class leader of a second batch delivered in 2015, detail view of A end.
160128_00339.jpg
0031 CNR - QRRS China 160128 00339401 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0031, class leader of a second batch delivered in 2015 with safety slogan 'Safety - It's your life'.
100330_8066.jpg
100330 8066401 viewsRio Tinto compressor waggon set CB 05, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons. Seen here just outside of 7 Mile. 30th March 2010.
241-28.jpg
241-28401 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as three loaded ore rakes behind a pair of CM40-8M units on each wait their turn through the dumper to discharge. June 2002.
190107_0581.jpg
190107 0581401 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00370 built by CSR Yangtze Co China serial 2014/382-370 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1589.jpg
190109 1589401 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00373 built by CSR Yangtze Co China serial 2014/382-373 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1613.jpg
190109 1613401 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00312 built by CSR Yangtze Co China serial 2014/382-312 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
243-20.jpg
243-20401 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
247-34.jpg
247-34401 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train passes under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 with 9410, 9420 and last unit 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 riding on Dofasco bogies and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. Location is here.22nd May 2002.
249-25.jpg
249-25401 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking upstream to the east from the middle of the bridge following Cyclone John on 18th December 1999. Approximate location.
19220 files on 961 page(s) 670

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional