Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
060429_3728.jpg
060429 3728365 viewsFlash Butt yard, Pony re-laying waggon, #2, originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.
060429_3759.jpg
060429 3759365 viewsFlash Butt yard, Pony re-laying waggon, 6001 originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966 of which three were sold to Mt Newman Mining in 1967 and numbered 6001-6003.
060501_3868.jpg
060501 3868365 viewsTabba Siding, ballast plough waggon converted from Magor USA built Oroville ore waggon 538, still visible is the ODCX 82160 number from original service building the Oroville Dam.
060618_6221.jpg
060618 6221365 viewsFlash Butt yard, modified original Magor USA built Oroville waggon 589, cut down and covered for use as indexing waggons at Finucane Island car dumpers, note the original ODCX marking visible.
060713_6549.jpg
060713 6549365 viewsBoodarie Yard, modified original Magor USA built Oroville waggon 594, cut down and covered and in use as indexing waggons on the front of each rake for Finucane Island car dumpers, note the original ODCX marking visible.
050421_1141.jpg
050421 1141365 viewsGillam Siding backtrack, BHP's ballast regulator BR 31 a Plasser Australia SSP 110SW model serial 401, front view from loading ramp. 21st April 2005.
050801_4753.jpg
050801 4753365 viewsFlash Butt yard, Barclay Mowlem TM 21 a Plasser Australia 09-16 model tamper, shows original owner B & M Whitmore Pty Ltd. 1st August 2005.
051001_5670.jpg
051001 5670365 viewsFlash Butt yard, Jackson model 6700 tamper serial 153246 lettered for Railway Equipment Leasing And Maintenance RELAM Inc undergoing delivery checks. 1st October 2005.
060501_3923.jpg
060501 3923365 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder with 24 grinding wheels, serial M20, third grinding module. 1st May 2006.
080621_2716.jpg
080621 2716365 viewsTabba South, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6104 in service with the rail recovery and transport train as waggon #6.
110411_10002.jpg
110411 10002365 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0018 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
150523_8222.jpg
150523 8222365 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggons 0037 and 0033, both from a second batch delivered in 2015 with safety slogan 'Safety is a core value' and 'Don't drive tired'.
190107_0585.jpg
190107 0585365 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00240 built by CSR Yangtze Co China serial 2014/382-240 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1630.jpg
190109 1630365 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00019 built by CSR Yangtze Co China serial 2014/382-19 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1640.jpg
190109 1640365 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00232 built by CSR Yangtze Co China serial 2014/382-232 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
243-03.jpg
243-03365 viewsPort Hedland, Don Rhodes Mining Museum, preserved locomotives from the early days of the Port Hedland iron ore miners of Goldsworthy Mining and Mt Newman Mining. From left is Mt Newman Mining 5497, a Comeng NSW built M636 ALCo unit, Mt Newman Mining 5451 which was built by EMD as an F7A model and started life with Western Pacific in the USA and Goldsworthy Mining B class unit #2 built by English Electric serial number A-105. August 2003.
080124_1630.jpg
080124 1630365 viewsChapman Siding, new FMG ore waggon pair 1311 slave and 2312 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
248-21.jpg
248-21365 viewsSeven Mile yard, stored Robe River ALCo locomotives at the south end of the Hamersley Iron Seven Mile yard on roads N2 and N3. On N2 is a cab comparison between AE Goodwin built ALCo M636 unit 9412 serial G-6060-3 from December 1971 and originally numbered 262.003 during construction and then 1712 on MLW Dofasco bogies with C636R units 9427 a Comeng WA C636R rebuild from ALCo Schenectady NY model C636 serial 3499-2 originally built in January 1968 for Pennsylvania Railroad as #6331, Penn Central 6331 and finally Conrail 6781. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in January 1987 riding on the ALCo Hi-Ad bogie. This loco also went on to become DR 8403 for construction of FMG's railway in 2007-08. Behind it on N3 is 9413. Approximate location. 24th April 2004.
252-01.jpg
252-01365 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, National Steel Car Company of Canada built ballast hopper waggon BH 047 built in January 1971. A batch of twenty were built for Hamersley Iron. Location is roughly here. 24th November 2001.
254-01.jpg
254-01365 viewsWodgina mine site, bull buggy from a cut down 60 series Toyota Landcruiser from Wallareenya Station.
19088 files on 955 page(s) 667

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional