Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
050518_2133.jpg
CHRY 761 050518 2133407 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 761, shows bogie detail, ASF Ride Control bogie with CFCLA id of CQFE 111.
050518_2195.jpg
0504 Magor USA 050518 2195407 viewsBing Siding. Side view of 1963 built Magor USA waggon 504, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
050704_3988.jpg
0010 Comeng NSW 050704 3988407 viewsBing Siding, empty 116 kL Comeng NSW built tank waggon 0010 from 1972, one of three such tank waggons.
050315_0242.jpg
0010 Comeng NSW 050315 0242407 viewsRedbank Bridge, elevated view of empty 116 kL fuel tanks all built by Comeng in both NSW and WA, 0010 and others in the BHP blue and white livery.
050522_2740.jpg
6702 Mt Newman Mining Workshops 050522 2740407 viewsGoldsworthy Junction, rail recovery and transport train, flat waggon 6702, heavily cut down and modified Magor USA ore waggon by Mt Newman Mining workshops, converted to a 50 tonne waggon and designated the winch waggon with generator set to power the winch and the crib car.
060501_3903.jpg
8704 Difco USA 060501 3903407 viewsTabba Siding, a string of Difco side dumps on the rear of a loaded ballast train.
050414_0947.jpg
050414 0947407 viewsFlash Butt yard, Speno Australia's 24 stone rail grinder before they had id stickers fitted, this front unit was later stickered as RG 2. 14th April 2005.
050421_1177.jpg
050421 1177407 viewsAbydos Siding backtrack, Barclay Mowlem track tamper a Fairmont Jackson model 6700 tamper rear view with the light buggy stowed. 21st April 2005.
050421_1615.jpg
050421 1615407 viewsHesta Siding backtrack, Speno Australia's 24 stone rail grinder before they had id stickers fitted, this unit was later stickered as RG 2, side view of the second grinding module. 21st April 2005.
060326_3214.jpg
060326 3214407 viewsBing Siding, BHP track machine Tamper 3 a Plasser Australia unit model 09-3X serial M480 runs towards Nelson Point on the mainline with the new western mainline in the foreground and Bing passing track on the right. 26th March 2006.
080621_2729.jpg
6214 Gemco 080621 2729407 viewsGillman Siding, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, detail of A end.
100717_0663.jpg
6040 Gemco WA 100717 0663407 viewsFlash Butt yard, new rail stock carrier waggon 6040, built by Gemco Rail in late 2009-10 with Barber bogies.
110208_9432.jpg
6214 Gemco WA 110208 9432407 viewsFlash Butt yard, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the chutes can be seen standing up with the squeeze rollers behind the mesh.
110411_10016.jpg
0013 Comeng WA 110411 10016407 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0013 from 1974-5, one of six such tank waggons.
170510_8293.jpg
170510 8293407 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
190109_1667.jpg
190109 1667407 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00193 built by CSR Yangtze Co China serial 2014/382-193 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
249-17.jpg
249-17407 viewsTable Hill on the Robe River railway line, looking in a northerly direction as the railway line snakes north and heads through Lockyer Gap towards Cape Lambert. Following a very wet 1999 cyclone season Lake Poongkaliyarra is very full. Approximate location.
250-17.jpg
250-17407 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind the standard pairing of two General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 stand on the loop or passing track for a meet with a loaded train. 1550 hrs 21st October 2000.
245-22.jpg
245-22407 viewsWudinna, empty grain train shunts out of the grain siding, former Australian National Co-Co locomotives AE Goodwin ALCo model DL531 830 class units 842, serial no. 84140 and 851 serial no. 84137, 851 having been on the Eyre Peninsula since delivered in 1962. 7th April, 2003.
190129_4292.jpg
190129 4292407 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00267 built by CSR Yangtze Co China serial 2014/382-267 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
19220 files on 961 page(s) 644

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional