Most viewed |

130708 0788408 viewsCharra, crossing loop, 466.2 km.
|
|

130708 0797408 viewsCharra, crossing loop, 466.2 km.
|
|

130708 0872408 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.
|
|

130708 0873408 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.
|
|

130708 0881408 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.
|
|

PD 12843408 viewsWest Kalgoorlie, AOPY 32400 with fleet number 930, one of seventy ex ANR coal waggons rebuilt from AOKF type by Bluebird Engineering SA in service with ARG on Koolyanobbing iron ore trains. They used to be three metres longer and originally built by Metropolitan Cammell Britain as GB type in 1952-55, seen here in a rake with sister waggons.
|
|

060530 4921408 viewsParkeston, AHLY 0058 one of sixty five AHBY class ballast hoppers built by EDI Rail at their Port Augusta Workshops for ARG in 2001-02 for the Darwin line construction, now in limestone quarry products service.
|
|

100611 0319408 viewsMidland, AQHY 30079 with sulphuric acid tank CSA 0054, originally built by the WAGR Midland Workshops in 1964/66 at WF type flat waggons, then following several codes and modifications in 1997 seventy five were converted to WQH to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana.
|
|

224-30408 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie departs the loop south with sister unit 6073. GeoData.
|
|

225-26408 views24.1 km grade crossing on the Newman line, empty train racing off into the distance. GeoData.
|
|

229-08408 viewsYandi Two balloon switch, empty BHP train heading for the loadout with mid-train remote unit Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151, cab side. GeoData.
|
|

229-30408 viewsYandi Two loadout exit side, as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister unit drag a loading train at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan, on the left the mid-train remotes can just be made out. GeoData.
|
|

151111 9530408 viewsA loaded train behind General Electric ES44DCi units 8113 serial 59105 in the original silver livery and 8145 serial 58726 in the tiger strip Rio livery and Dash 9-44CW 9433 serial 54766 in ROBE Pilbara Iron livery runs along on the West Mainline bound for Cape Lambert viewed from Table Hill.
|
|

151111 9542408 viewsAn empty train led by General Electric ES44DCi units 8162 serial 60226 and 8167 serial 60231 both in the Rio Tinto tiger strip livery leading Dash 9-44CW 7093 serial 47772, the last of the original build of Dash 9 units crossing Lake Poongkaliyarra.
|
|

231-17408 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
|
|

233-28408 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

236-33408 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's General Electric built AC6000 unit 6077 'Nimingarra' serial 51069 sits out the front.
|
|

236-36408 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's General Electric built AC6000 unit 6071 'Chichester' serial 51063 sits out the front with new windscreen protectors or 'blinkers' fitted, cab side and bogie view.
|
|

060110 2204408 viewsYeelanna, ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 stands on the mainline as the second person restores the point for the main, a rake of waggons in grain siding await loading, with the 5 ton crane also visible. Approx. location of image.
|
|

160531 9871408 viewsWest Kalgoorlie, diesel fuel tanker ATPY 601, built by WAGR Midland Workshops in 1976 as WJP type for BP Oil, capacity of 80500 litres.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
639 |  |
 |
 |
 |
 |
 |
 |
|