Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
130704_0392.jpg
130704 0392376 viewsKyancutta, HCN type bogie grain hopper waggon HCN 13, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
130704_0397.jpg
130704 0397376 viewsKyancutta, HAN type bogie grain hopper waggon class leader HAN 1, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130704_0402.jpg
130704 0402376 viewsKyancutta, HAN type bogie grain hopper waggon HAN 15, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130704_0498.jpg
130704 0498376 viewsMoule, view of the General Railway Signal Company point lever and indicator at the western end of the crossing loop. Location here, 4th July 2013.
130705_0570.jpg
130705 0570376 viewsLock, HAN type bogie grain hopper waggon HAN 36, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system. 5th July 2013.
130708_0868.jpg
130708 0868376 viewsThevenard, view of arriving loaded train from inside the yard.
130708_0951.jpg
130708 0951376 viewsThevenard,
060530_4936.jpg
060530 4936376 viewsParkeston, AHBY 0057 one of sixty five AHBY class ballast hoppers built by EDI Rail at their Port Augusta Workshops for ARG in 2001-02 for the Darwin line, also the FMG construction in 2008, here in limestone quarry products service.
060603_5267_WTDY4620E.jpg
060603 5267 WTDY4620E376 viewsMidland, WTDY 4620 fuel tank waggon, originally an NTAF type tanker, coded WTDY when arrived in WA, in BP service.
100601_8428.jpg
100601 8428376 viewsWest Kalgoorlie, WGL 633 originally one of three units built by Westrail Midland Workshops in 1976-7 as WGL type bogie flat waggon for Western Mining Corporation for bagged nickel matte traffic.
100601_8430.jpg
100601 8430376 viewsWest Kalgoorlie, WN 522, pneumatic discharge nickel concentrate waggon, one of thirty built by AE Goodwin NSW as WN type in 1970 for WMC.
221-26.jpg
221-26376 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.
225-26.jpg
225-26376 views24.1 km grade crossing on the Newman line, empty train racing off into the distance. GeoData.
229-30.jpg
229-30376 viewsYandi Two loadout exit side, as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister unit drag a loading train at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan, on the left the mid-train remotes can just be made out. GeoData.
232-24.jpg
232-24376 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.
235-15.jpg
235-15376 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 leads the afternoon 240 waggon train with second unit Goninan built CM39-8 unit 5630 'Zeus' as the exit the loadout tunnel, notice the fuel tank differences between the lead unit an ALCo rebuild and the second unit built new.
236-28.jpg
236-28376 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention.
060110_2194.jpg
060110 2194376 viewsYeelanna, ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 shunts forward to cut out the empty cars for the siding. Approx. location of image.
160531_9873.jpg
160531 9873376 viewsWest Kalgoorlie, diesel fuel tank waggon ATEY 7315, BP Oil service, ex Ampol, other codes include ex NSW NTAF, WTEF and WTEY.
160531_9956.jpg
160531 9956376 viewsWest Kalgoorlie, diesel fuel tanker ATPF 572, Shell Fleet No. TR707, built by WAGR Midland Workshops in 1974 for Shell, capacity of 80500 litres.
19088 files on 955 page(s) 619

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional