Most viewed |

050801 4742414 viewsFlash Butt yard, BHP clip driving machine, modified from a former Plasser Australia USP 3000 ballast regulator. 1st August 2005.
|
|

6021 Gemco WA 100717 0669414 viewsFlash Butt yard, new rail stock carrier waggon 6021, built by Gemco Rail in 2010 riding on Barber bogies.
|
|

6038 Gemco WA 110208 9444414 viewsFlash Butt yard, new rail stock carrier waggon 6038 loaded with strings of rail, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

0004 Comeng NSW 110411 10025414 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71.
|
|

0013 Comeng WA 150314 7739414 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0013 from 1974-5, one of six such tank waggons.
|
|

0710 CNR - QRRS China 150619 9077414 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0710 loaded with fines for sheeting.
|
|

030404 082806414 viewsPort Germein, Perth bound steel and intermodal hurries through on the main behind National Rail's Goninan built GE Cv40-9i model NR class units NR 30 serial 7250-06 / 97-236 and a sister unit. 4th April 2003.
|
|

030404 125126414 viewsPort Augusta Spencer Junction yard, a Perth bound intermodal awaits departure time on 13 Road behind National Rail NR class units built by Goninan as GE Cv40-9i models, NR 50 serial 7250-08 / 97-252. 4th April 2003.
|
|

170730 0492414 viewsIndee, an empty Roy Hill train rounds the curve at the Indee Rd grade crossing at the 53.3 km behind General Electric built double ES44ACi units RHA 1008 serial 62580 and RHA 1018 with 112 waggons, a mid-train unit and another 112 waggons. 30th July 2017. GeoData.
|
|

241-12414 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. This image shows the Dash 8 radiator frame fitted to it following collision repairs. June 2002.
|
|

241-33414 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge passing a similar consist with the Ore Car Repair Shop in the background. June 2002.
|
|

190107 0652414 viewsWest Kalgoorlie, radiator end view of Mineral Resources MRL class loco MRL 002 'Spirit of Yilgarn' with serial R-0113-03/14-505 a UGL Rail Broadmeadow NSW built GE model C44ACi model locomotive.
|
|

190109 1588414 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00095 built by CSR Yangtze Co China serial 2014/382-95 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1626414 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00236 built by CSR Yangtze Co China serial 2014/382-236 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

01187 080116 1377414 viewsChapman Siding, FMG slave waggon 1187, built by CSR at their Zhuzhou Rolling Stock Works in China during August 2007, view of the builders plate and bracket for RFID tag. 16th January 2008.
|
|

TK 06 110620 2275414 viewsChapman, FMG TK type fuel tank waggon TK 06 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
|
|

TK 04 110620 2276414 viewsChapman, FMG TK type fuel tank waggon TK 04 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
|
|

248-07414 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 9408 serial 54158 from the fourth order in 2003 wearing the Pilbara Rail livery with Robe ownership markings. Approximate location. 24th April 2004.
|
|

249-09414 viewsYule River bridge looking east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

252-08414 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, General Electric built 9-44CW unit 7088 with serial number 47767 from the original 1994 build idles away on the eastern end of the ballast train as it is loaded and slowly progresses into the back track siding Ballast plough BP 02 is behind the locomotive. View of the long hood, fuel tank and lettering. Location is roughly here. 24th November 2001.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
616 |  |
 |
 |
 |
 |
 |
 |
|