Most viewed |

241-04418 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. June 2002.
|
|

241-19418 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. Three quarter rear view. June 2002.
|
|

190107 0554418 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00201 built by CSR Yangtze Co China serial 2014/382-201 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0571418 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00091 built by CSR Yangtze Co China serial 2014/382-91 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1639418 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00231 built by CSR Yangtze Co China serial 2014/382-231 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

02372 080116 1380418 viewsChapman Siding 69 km, the Zhuzhou Rolling Stock Works cast bogie underneath FMG master waggon 2372, bogie has a cast date of 08-07 for August 2007 and is riding on Timken AP Glass G 7 x 17 bearings. 16th January 2008.
|
|

01515 080304 2203418 viewsThomas Yard, down the rail welding end, side view of slave waggon 1515, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

247-30418 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train is about to pass under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8. Location is here.22nd May 2002.
|
|

249-27418 viewsA loaded Hamersley Iron train runs across the plains north of Dugite Siding near the 70 km as it nears the destination of its cargo. Approximate location. 18th December 1999.
|
|

190129 4342418 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00372 built by CSR Yangtze Co China serial 2014/382-372 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 4345418 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00222 built by CSR Yangtze Co China serial 2014/382-222 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

140601 4458418 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7648 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|

140601 4674418 viewsMidland, loaded iron ore train #1030 heading to Kwinana, CFCLA leased CHCH type waggon CHCH 7785 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|

267-28418 views39 km Newman line, Goninan rebuild CM40-8M unit 5634 'Boodarie' serial number 8151-07 / 91-120 slows as it brings the Sundowner special to a stop at the 39 km detector site on the Newman mainline.
The trailing unit is 5653.
This was a special for the 25 years of the Alstom / BHP service agreement.
Friday 12th of April 2002.
|
|

160710 iPh5S 2787418 viewsWittenoom Gorge, Pyramid Pool looking north along the western wall of the gorge. Geodata.
|
|

160409 IMG 7057418 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

231020 8254418 viewsParkeston, QQYY type 40' container waggon QQYY 57907 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000623 with Cristal decal and CRM 000349 with Cristal decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|

240701 2730418 viewsPilbara Railways Historical Society, passenger carriage 'Fortescue' was originally built by Clyde Engineering at Granville NSW in 1936 for the NSWGR as a second class railway carriage FS type FS 2141. In 1975 it was purchased by the Society and is named after a local river. July 1, 2024.
|
|

140-1-21417 viewsBallarat North or C Signal Box, view of the interlocked gates for the grade crossing at Macarthur Street, looking towards Ballarat.
|
|

151-21417 viewsTraralgon station platform, V/Line broad gauge light engine 2nd unit X class X 43 Clyde Engineering EMD model G26C serial 70-706 awaits departure time for Morwell with 9444 light engine, then loaded briquette train for Nth Geelong, in heavy fog.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
602 |  |
 |
 |
 |
 |
 |
 |
|