Most viewed |

110602 8647421 viewsRio Tinto compressor waggon set CB 03, receiver waggon with two air tanks or receivers. These are built on former ore waggons that have been cut down. Seen here on the causeway just outside of 7 Mile. 2nd June 2011.
|
|

030415 150535421 viewsFerguson, located at the 469 km on the Trans Australian Railway, station nameboard. GeoData location.
|
|

190107 0529421 viewsBinduli, following a crew change Mineral Resources empty iron ore train 2034 with Mineral Resources MRL class loco MRL 003 'Southern Cross' with serial R-0113-03/14-506 a UGL Rail Broadmeadow NSW built GE model C44ACi model leads two Pacific National NR class units NR 43 and NR 78 with 53 pairs of MHPYs and 2 single MHLY bottom discharge hopper waggons for 1293 metres and 2258 tonnes.
|
|

190107 0535421 viewsBinduli, Mineral Resources empty iron ore train 2034 with third unit Pacific National NR class loco NR 78 with serial 7250-02 / 97-280 a Goninan Bassendean WA built GE model Cv40-9i model locomotive with 4000 horsepower originally built for the National Rail Corporation.
|
|

190107 0570421 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00092 built by CSR Yangtze Co China serial 2014/382-92 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0585421 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00240 built by CSR Yangtze Co China serial 2014/382-240 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0621421 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00188 built by CSR Yangtze Co China serial 2014/382-188 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1660421 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00382 built by CSR Yangtze Co China serial 2014/382-382 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1671421 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00056 built by CSR Yangtze Co China serial 2014/382-56 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

246-26421 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons with newly extended roads either side of it. 9425 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 6266-8 / 89-85 from August 1989 riding on Hi-Ad bogies and was originally an AE Goodwin built M636 ALCo serial C-6041-4 and built new for Mt Newman Mining (later BHP Iron Ore) in April 1970 and numbered 5468, sold to Robe and delivered by road 17th August 1982. Everything below the frame is ALCo while above is GE and Pilbara Cab. 22nd May 2002.
|
|

247-13421 viewsCape Lambert overview of the fuel point, with a brace of four CM40-8M rebuilds finishing up refuelling before departing with another empty train. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.
|
|

247-15421 viewsCape Lambert overview of the fuel point, with a brace of four CM40-8M rebuilds finishing up refuelling before departing with another empty train. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.
|
|

249-34421 viewsLoaded Hamersley Iron ore waggon pair Tomlinson Steel WA built 5708 and Nippon Sharyo Japan built 906. Approximate location. 18th December 1999.
|
|

257-17421 viewsFlash Butt yard, view of Rail Dynamics Laboratory test waggon 2703 - Test Car R2, modified by BHP from waggon number 2716 in 1975, originally a Comeng built waggon dating from 1971. Late 2001.
|
|

245-16421 viewsWudinna, empty grain train shunts back into the grain siding with a trio of former Australian National Co-Co locomotives with rebuilt former AE Goodwin ALCo model DL531 830 class ex 839, serial no. 83730, rebuilt by Port Augusta Workshops to DA class, DA 4 leading two AE Goodwin ALCo model DL531 830 class units 842, serial no. 84140 and 851 serial no. 84137, 851 having been on the Eyre Peninsula since delivered in 1962. 7th April, 2003.
|
|

245-34421 viewsMinnipa yard looking in the up direction from the down end, on the left is goods siding #1, mainline to Port Lincoln, goods siding #2 and goods siding #3 on the right. 7th April, 2003.
|
|

140601 4496421 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7757 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|

160710 iPh5S 2789421 viewsWittenoom Gorge, old exposed mine adit of the Gorge Mine which was right up the very top of Wittenoom Gorge. Geodata.
|
|

150326 IMG 4343421 viewsWest Kalgoorlie, AZAY type waste oil waggon AZAY 23439, detail image, this waggon usually operates between Merredin Loco and Forrestfield, not normally seen here in the Goldfields. Peter Donaghy image.
|
|

210407 9890421 viewsParkeston, 2MP5 intermodal train, RRZY 7049 platform 1 of 5-pack well waggon set. Originally was an RQZY type, a five unit bar coupled well container waggon built as one of a batch of thirty two by Goninan NSW for National Rail in 1995/96. Recoded to RRZY when repaired. Loaded with a Toll 48' MEG1 type container TCML 48459. National Rail logo still visible.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
588 |  |
 |
 |
 |
 |
 |
 |
|