Most viewed |

0016 Comeng WA 110411 10027426 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0016 from 1974-5, one of six such tank waggons.
|
|

0025 CNR - QRRS China 150314 7746426 viewsBing Siding, empty 116 kL CNR-QRRS of China built tank waggon 0025, one of a batch of ten built in 2014.
|
|

0029 CNR - QRRS China 160128 00330426 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0029, one of a batch of ten built in 2014.
|
|

030403 162252426 viewsCrystal Brook, view from the A end of former Australian National 600 class AE Goodwin built ALCo DL541 model 603 serial G6015-2.
|
|

170729 0172426 viewsFortescue River Bridge on the Robe River line at the 115.8 km, a loaded Deepdale train heading for Cape Lambert behind the standard motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 run over the largest rail bridge in the Pilbara. 29th July 2017. GeoData.
|
|

240-18426 viewsWickham, left hand side number two end view of former Robe River and NSWGR MLW built ALCo RSC3 serial 77737 of October 1951, was originally 40 class 4006. Shows modified bogie to convert the A1A to a BO bogie type. 31st August 2002.
|
|

190107 0521426 viewsBinduli, following a crew change Mineral Resources empty iron ore train 2034 with Mineral Resources MRL class loco MRL 003 'Southern Cross' with serial R-0113-03/14-506 a UGL Rail Broadmeadow NSW built GE model C44ACi model leads two Pacific National NR class units NR 43 and NR 78 with 53 pairs of MHPYs and 2 single MHLY bottom discharge hopper waggons for 1293 metres and 2258 tonnes.
|
|

190107 0640426 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00189 built by CSR Yangtze Co China serial 2014/382-189 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1570426 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00086 built by CSR Yangtze Co China serial 2014/382-86 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1631426 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00136 built by CSR Yangtze Co China serial 2014/382-136 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1645426 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00075 built by CSR Yangtze Co China serial 2014/382-75 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1658426 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00301 built by CSR Yangtze Co China serial 2014/382-301 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

01313-02314 080124 1626426 viewsChapman Siding, new FMG ore waggon pair 1313 slave and 2314 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
|
|

02168 080304 2177426 viewsThomas Yard, down the rail welding end, side view of control waggon 2168, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

01333 080304 2178426 viewsThomas Yard, down the rail welding end, side view of slave waggon 1333, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

01367-02170 090121 1200426 viewsBoodarie, an FMG empty train with mismatched waggon pair slave 1367 22.6 tonnes tare and control 2170 22.9 tonne tare from the original CSR Zhuzhou Rolling Stock Works in China build from 2007.
|
|

200914 7785426 viewsPilbara Railways Historical Society museum, former Cliffs Robe River Iron Associates RSC-3 model ALCo locomotive built by Montreal Locomotive Works (MLW) in 1951 for NSWGR as the 40 class 4002 serial 77733, purchased by CRRIA in 1971 and numbered 261.002, then 1705 and finally 9405. 4002 is preserved in an operational state and another claim to fame is it run the Royal Train in NSW February 1954. Donated to the Society in 1979. 14th September 2020.
|
|

248-12426 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 7077 serial 47756 from the original first order in the Pepsi Can livery and 9408 serial 54158 from the fourth order in the Pilbara Rail livery with Robe ownership markings powers away to the south with the signal marker boards are in the distance. Approximate location. 24th April 2004.
|
|

251-03426 viewsNelson Point, BHP's recently retired Goninan WA ALCo C636 to GE C36-7M rebuild unit 5508 awaits its fate. Rebuilt in 1987 at Goninan's Welshpool factory from 1969 AE Goodwin built ALCo C636 with serial number G6041-2 and road number 5466 and assigned new serial number 4839-04 / 87-073. It was delivered in Mt Newman Mining orange and was named Fortescue. It also carried the marigold and teal version of the Australia map as part of the BHP logo. In 2003 it was fully rebuilt and leased to Pilbara Rail in that livery and numbered 5052. It survives stored at 7 mile complex as at Dec 2021. 22nd April 2000.
|
|

245-05426 viewsPort Lincoln loco workshops, still in former owner AN livery, Australian Southern 830 class locomotive 865 AE Goodwin ALCo model DL531 serial 84711, roster shot in multi-unit consist with sister unit 873 and DA class unit DA 6. 6th April 2003.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
566 |  |
 |
 |
 |
 |
 |
 |
|