Most viewed |

0527 Magor USA 050412 0750428 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA waggon 527, originally in ore service before conversion to a ballast waggon.
|
|

CHQY 745 050518 2081428 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 745.
|
|

CHRY 756 050518 2125428 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 756, shows brake rigging plate for original owner, C&NW.
|
|

0512 Magor USA 050518 2177428 viewsBing Siding. Side view of 1963 built Magor USA waggon 512, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

0517 Magor USA 050518 2181428 viewsBing Siding. Side view of 1963 built Magor USA waggon 517, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

0536 Magor USA 050518 2201428 viewsBing Siding. Rear 3/4 view of ballast train and of 1963 built Magor USA waggon 536, originally in ore service before conversion to a ballast waggon.
|
|

6205 Comeng WA 051001 5720428 viewsBoodarie, the Steel Train or rail recovery and transport train flat waggon #27, third lead off waggon, 6205, built by Comeng WA in February 1977 under order no. 07-M-282 RY.
|
|

6010 Scotts of Ipswich Qld 050525 2989428 viewsMooka Siding, rail recovery and transport train flat waggon #21, 6007 with registered number G506007, built by Scotts of Ipswich Qld in 1970.
|
|

6208 Comeng WA 050525 2991428 viewsMooka Siding, rail recovery and transport train flat waggon #23, 6208, built by Comeng WA in February 1977 under order number 07-M-282 RY.
|
|

0013 Comeng WA 050724 4309428 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0013 from 1974-5, one of six such tank waggons.
|
|

8702 Difco USA 060501 3900428 viewsTabba Siding, originally built by Difco USA for Goldsworthy Mining Ltd in 1967 as a batch of five, prefixed with 870 in BHP service, 8702 side dump waggon loaded with ballast.
|
|

050412 0820428 viewsAbydos Siding backtrack, front view of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
|
|

050421 1314428 viewsShaw Siding, BHP's Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper runs along the mainline track. 21st April 2005.
|
|

050625 3602428 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480. 25th June 2005.
|
|

6047 Gemco WA 100717 0687428 viewsFlash Butt yard, new rail winch waggon 6047 obstructed by scrub, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

CHTY 715 130720 1435428 viewsFlash Butt yard, CFCLA ballast waggon CHTY class CHTY 715, modified from a similar CHQY class with the end framing removed attached to an SD40R unit 3091.
|
|

030404 125244428 viewsPort Augusta Spencer Junction yard, crew coach on Perth bound intermodal. 4th April 2003.
|
|

060724 7864428 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 24th July 2006.
|
|

240-18428 viewsWickham, left hand side number two end view of former Robe River and NSWGR MLW built ALCo RSC3 serial 77737 of October 1951, was originally 40 class 4006. Shows modified bogie to convert the A1A to a BO bogie type. 31st August 2002.
|
|

190107 0562428 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00021 built by CSR Yangtze Co China serial 2014/382-21 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
557 |  |
 |
 |
 |
 |
 |
 |
|