Most viewed |

190109 1577403 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00226 built by CSR Yangtze Co China serial 2014/382-226 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1612403 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00312 built by CSR Yangtze Co China serial 2014/382-312 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1629403 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00020 built by CSR Yangtze Co China serial 2014/382-20 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

6987 001403 viewsWelshpool, Goninan Open Day 27th August, 1988. Mt Newman Mining's Goninan new build GE CM39-8 model loco 5630 'Zeus' serial 5831-09 / 88-079.
Jim Bisdee photo.
|
|

150619 9099403 viewsFlash Butt yard, Speno owned and operated rail grinder RG2 for BHP, rail grinding module, from the left blower fans and filter housing, 5000 litre fuel tank, rear of power and driving unit, grinding hood beside bogie with spare grinding stones or wheels above bogie.
|
|

248-06403 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 9408 serial 54158 from the fourth order in 2003 wearing the Pilbara Rail livery with Robe ownership markings. The blue 230 sign is the indication that there is 230 waggons in clear at that point. Approximate location. 24th April 2004.
|
|

250-09403 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind the standard pairing of two General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 stand on the loop or passing track for a meet with a loaded train. 21st October 2000.
|
|

251-02403 viewsNelson Point, BHP's recently retired Goninan WA ALCo C636 to GE C36-7M rebuild unit 5506 awaits its fate. Rebuilt in 1987 at Goninan's Welshpool factory from 1969 AE Goodwin built ALCo C636 with serial number G6012-4 and road number 5455 and assigned new serial number 4839-01 / 87-071. It was delivered in Mt Newman Mining orange and was named Mt Whaleback, then in 1991 5506 emerged in BHP livery carrying Ethel Creek, it was later changed to Mt Goldsworthy, it was also one of three units to carry the Goldsworthy Joint Venture lettering. 22nd April 2000.
|
|

210322 9566403 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 124 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
|
|

245-14403 viewsWudinna, empty grain train shunts a rake of waggons before backing them into the grain siding, former Australian National Co-Co locomotives AE Goodwin ALCo model DL531 830 class units 842, serial no. 84140 and 851 serial no. 84137, 851 having been on the Eyre Peninsula since delivered in 1962. 7th April, 2003.
|
|

269-15403 viewsBing North and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
|
|

210407 9861403 viewsParkeston, 2MP5 intermodal train, CQWY type well waggon 5047 well 1 with a RAND Refrigerated Logistics 46' 6" MPR1 type reefer RAND 165. The CQWY well waggon pairs were built by Bluebird Rail Operations SA in a batch of sixty pairs in 2008 for CFCLA.
|
|

210407 9905403 viewsParkeston, 2MP5 intermodal train, RRQY type articulated five-unit container waggon set RRQY 8316 platform 2, built by Qiqihar Rollingstock Works in China as part of a forty one unit order in 2005/06 for Pacific National.
|
|

130710 1052403 viewsParkeston, SCT train 3PG1, PBGY type covered van PBGY 0094 Multi-Freighter, one of eighty waggons from the second order built by Gemco WA for SCT.
|
|

146-26402 viewsBroadford, buffer stop located near station on up Refuge Siding, standard gauge line behind it.
|
|

146-29402 viewsWandong, station up platform shelter and waiting room.
|
|

149-09402 viewsBacchus Marsh yard overview looking towards Melbourne, taken from Dock Rd, Siding D to turntable at left, Signal posts 4 and 3 with post 2 just visible beyond the gangers trolley shed.
|
|

150-31402 viewsLismore station building front elevation, looking across three yard tracks, building still used for safeworking purposes.
|
|

153-3-26402 viewsGeelong station platform two, V/Line broad gauge N class N 467 'City of Stawell' Clyde Engineering EMD model JT22HC-2 serial 86-1196 prepares to couple to a D van on up passenger train.
|
|

161-25402 viewsTocumwal, sleeper loading forklift contraption.
|
|
| 19088 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
499 |  |
 |
 |
 |
 |
 |
 |
|