Most viewed |

161109 1931443 viewsMoule, originally built by Kinki Sharyo as the NH type for the NAR in 1968, sent to Port Lincoln in 1978, then rebuilt and recoded ENH type in 1984, ENH 14, refurbished and wearing current owner Genesee & Wyoming orange and decal with matching hungry boards loaded with gypsum.
|
|

161111 2494443 viewsBinduli, Kalgoorlie Freighter train 5025, waggon AQRY 1011 platform A with two 20' 22G1 type boxes, a TAL TCLU 724006[4] and Triton TCKU 233940[0]. The AQRY are a bar-coupled pair and were used for rail transport as the AFRF type on the Darwin line and are originally former ANR-CR waggons.
|
|

161111 2524443 viewsBinduli, Kalgoorlie Freighter train 5025, waggon AQHY 30082 with sulphuric acid tank CSA 0112, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana.
|
|

0001 Comeng NSW 050414 0943443 viewsFlash Butt yard, Comeng NSW built 82 kilolitre water tank waggon 0001, one of two such tank waggons built in November 1970.
|
|

CHQY 734 050518 2096443 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 734.
|
|

0538 Mt Newman Mining Workshops 051001 5639443 viewsFlash Butt yard, side view of ballast plough converted from Magor USA built Oroville ore waggon 538, still visible is the ODCX 82160 number from original service building the Oroville Dam.
|
|

6009 Scotts of Ipswich Qld 050522 2726443 viewsGoldsworthy Junction, rail recovery and transport train flat waggon #16, 6009 built by Scotts of Ipswich Qld in September 1970.
|
|

6005 Scotts of Ipswich Qld 050522 2734443 viewsGoldsworthy Junction, rail recovery and transport train flat waggon #24, 6005 with registered number G506007, built by Scotts of Ipswich Qld in 1970.
|
|

0012 Comeng NSW 050724 4313443 viewsBing Siding, empty 116 kL Comeng NSW built tank waggon 0012 from 1972, one of three such tank waggons.
|
|

0522 Mt Newman Mining Workshops 060414 3440443 viewsNelson Point yard, weighbridge test waggon 522, originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a 20 ton axle load test waggon. The others in the fleet are 40, 60 and 100 tons. April 14, 2006.
|
|

6017 Comeng WA 060429 3733443 viewsFlash Butt yard, Pony waggon 6017, built by Comeng WA in 1971 in a batch of three numbered 6014-6017, view of asset number 6506-017.
|
|

050410 0512443 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

6203 Comeng WA 081217 0458443 viewsWoodstock Siding, rail recovery and transport train flat waggon #1, rear lead off waggon 6203, built by Comeng WA in January 1977 under order number 07-M-282 RY. The straddle crane is a newish unit built by Vaia Car model no. TCR-V and the four wheels are chain driven, replacing the original Gemco hydraulic unit.
|
|

030403 165508443 viewsRed Hill, a Clyde Engineering built EMD JT46C model AN class unit AN 6 serial 93-1302 on an Adelaide and then Melbourne bound service depart following a crib break for the driver. 3rd April 2003.
|
|

170510 8282443 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
|
|

030416 084242443 viewsCarnes Siding located at the 566.4 km on the Central Australian line from Tarcoola to Alice Springs. View looking south from the north end of the goods siding rejoining the loop and the mainline at right. The train control 'pillbox' concrete hut is visible with the station nameboard the white item beside it. GeoData location. 16th April 2003.
|
|

171121 0971443 viewsBarker Siding, Loram rail grinder MPC 2, this was sent out from the USA where it was operational as LMIX 602 for Loram. The generator and driving cab look to be fitted to an 85 foot piggy back waggon. 21st November 2017.
|
|

242-15443 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
|
|

180615 1574443 viewsWalla Siding, BHP took delivery of two new ballast ploughs in December 2017. They were built by CRRC Yangtze China in 2017 and weigh in at 65 tonnes. The ploughs are numbered BP 01 and BP 02. We finally caught up with them top and tail on a ballast consist, here's BP 02.
Roland Depth photo.
|
|

190107 0439443 viewsParkeston, Mineral Resources Ltd MHPY type iron ore waggon MHPY 00363 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
492 |  |
 |
 |
 |
 |
 |
 |
|