Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
050724_4308.jpg
0015 Comeng WA 050724 4308445 viewsBing Siding, empty fuel tank waggon 0015, a Comeng WA built 116 kilolitre tank waggon, one of a batch of six built in 1974-75 wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.
060429_3745.jpg
6703 Mt Newman Mining Workshops 060429 3745445 viewsFlash Butt yard, Pony re-laying waggon 6703 is a heavily cut down and modified Magor USA ore waggon done by Mt Newman Mining workshops, converted to a 50 tonne flat waggon.
050409_0409.jpg
050409 0409445 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480 view of engine compartment. 9th April 2005.
110208_9437.jpg
6101 Mt Newman Mining Workshops 110208 9437445 viewsFlash Butt yard, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6101 in service with the rail recovery and transport train.
030404_082858.jpg
030404 082858445 viewsPort Germein, Perth bound steel and intermodal hurries through on the main behind National Rail's NR class units, showing one and a half stacking and new vehicles on flat waggons. 4th April 2003.
030404_103013.jpg
030404 103013445 viewsPort Augusta, Goninan built GE model Cv40-9i NR class unit NR 30 serial 7250-05 / 97-232 was painted in a Bessie Liddle of Alice Springs designed aboriginal livery titled 'Warmi' or the snake, John Moriarty of Balarinji Design did the artwork.
030404_125337.jpg
030404 125337445 viewsPort Augusta Spencer Junction yard, a Perth bound intermodal awaits departure time on 13 Road behind National Rail NR class units built by Goninan as GE Cv40-9i models, NR 50 serial 7250-08 / 97-252. 4th April 2003.
060723_7846.jpg
060723 7846445 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 23rd July 2006.
22928.jpg
22928445 viewsBassendean, Goninan workshops, view of several Mt Newman Mining ALCo units awaiting rebuilding or scrapping. November 1992.
Jim Bisdee photo.
030415_155126.jpg
030415 155126445 viewsTarcoola, at the 504.5 km, looking east, end of the No. 2 Loco Road, No. 1 Water Road curving in from the right, spur from Camp Train and No. 1 Loco Roads as left and mainline to the far left. GeoData location. 15th April 2003.
030416_105554.jpg
030416 105554445 viewsManguri Siding looking towards Tarcoola from the south end of the loop, located 706.5 km from the 0 datum at Coonamia and 200 km north of Tarcoola between Wirrida and Cadney Park on the Tarcoola - Alice Springs line. GeoData location. 16th April 2003.
171018_0954.jpg
171018 0954445 viewsTad Yard, overview of Roy Hill's fuel tanks and waggon loading gantry with a fuel train being loaded headed up by ES44ACi unit RHA 1020 serial number 64301 built in Erie Pennsylvania, USA by GE. 17th October 2018.
190107_0446.jpg
190107 0446445 viewsParkeston, Mineral Resources Ltd MHPY type iron ore waggon married pair set MHPY 00014 and MHPY 00013 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0455.jpg
190107 0455445 viewsParkeston, Mineral Resources Ltd MHPY type iron ore waggon MHPY 00363 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0479.jpg
190107 0479445 viewsParkeston, Mineral Resources MRL class loco MRL 002 'Spirit of Yilgarn' with serial R-0113-03/14-505 a UGL Rail Broadmeadow NSW built GE model C44ACi in 2014 is pushed back along the loop to as the power consist of Pacific National NR 60 and NR 8 runs around the waggon rake.
190107_0564.jpg
190107 0564445 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00296 built by CSR Yangtze Co China serial 2014/382-296 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0597.jpg
190107 0597445 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00352 built by CSR Yangtze Co China serial 2014/382-352 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1554.jpg
190109 1554445 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL 005 'Carina Flyer' with serial number R-0113-05/14-508 and is a UGL Rail Broadmeadow NSW built GE C44ACi model locomotive, one of six such units built for Mineral Resources in 2014.
190109_1637.jpg
190109 1637445 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00365 built by CSR Yangtze Co China serial 2014/382-365 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1669.jpg
190109 1669445 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00238 built by CSR Yangtze Co China serial 2014/382-238 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
19220 files on 961 page(s) 481

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional