Most viewed |

CHQY 741 040805 095709451 viewsNelson Point, CFCLA CHQY type ballast waggon CHQY 741.
|
|

6702 Mt Newman Mining Workshops 050801 4763451 viewsFlash Butt yard, rail recovery and transport train, flat waggon 6702, heavily cut down and modified Magor USA ore waggon by Mt Newman Mining workshops, converted to a 50 tonne waggon and designated the winch waggon with generator set to power the winch and the crib car.
|
|

0016 Comeng WA 050315 0238451 viewsRedbank Bridge, elevated view of empty 116 kL fuel tanks all built by Comeng in both NSW and WA, 0016 and 0014 and others in the BHP blue and white livery.
|
|

060429 3718451 viewsFlash Butt yard, a view along the Harsco 'Pony' track resleeping and relaying machine and sleeper carting waggons and gantry trolleys.
|
|

060710 6227451 viewsAt the Broome Rd grade crossing Port Hedland, Switch Tamper SW 02 a Plasser Australia model Unimat S4 switch tamper. 10th July 2006.
|
|

030404 125115451 viewsPort Augusta Spencer Junction yard, a Perth bound intermodal awaits departure time on 13 Road behind National Rail NR class units built by Goninan as GE Cv40-9i models, NR 50 serial 7250-08 / 97-252. 4th April 2003.
|
|

170728 09895451 viewsWestern Creek, the disabled Mesa A train gets underway with relief power from General Electric built ES44DCi unit 8137 serial 59140 and Dash 9-44CW unit 7082 as the operate the train with the two ES44ACi units isolated. An empty train can be seen climbing the grade up through Emu. 28th July 2017. GeoData.
|
|

170728 10007451 viewsBenson Falls, 91 km curve, an empty train blasts up the steep grade behind a General Electric built Dash 9-44CW unit 7072 serial 47751 leads two General Electric built ES44DCi units 8140 and 8158, 7072 is from the original delivery of Dash 9-44CW units in 1994 and is showing its age. 28th July 2017. GeoData.
|
|

5952 001451 viewsWelshpool, Goninan workshops, Mt Newman Mining C636 ALCo unit 5452 serial G6012-1 built by AE Goodwin in May 1968 is undergoing a world first as it gets rebuilt into a GE C36-7M locomotive, by July 1987 it would become 5509. Sept 1986.
Jim Bisdee photo.
|
|

23694451 viewsBassendean, Goninan workshops, Mt Newman Mining's AE Goodwin built ALCo model M636 unit 5473 serial G6047-5 undergoing rebuilding into a GE CM40-8M unit, 5473 would emerge rebuilt as 5649 in July 1993. December 1992.
Jim Bisdee photo.
|
|

23882451 viewsBassendean, Goninan workshops, BHP Iron Ore GE CM40-8M rebuild unit 5649 'Pohang' serial 8412-07 / 93-140 is being lifted up and prepped for road haulage to Port Hedland. 5649 was rebuilt from AE Goodwin ALCo M636 unit 5473 serial G6047-5. July 1993.
Jim Bisdee photo.
|
|

23906451 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5474 serial G6047-6 being stripped prior to rebuilding into CM40-8M 5655 in December 1993. July 1993.
Jim Bisdee photo.
|
|

030416 084004451 viewsCarnes Siding located at the 566.4 km on the Central Australian line from Tarcoola to Alice Springs. Station nameboard. GeoData location. 16th April 2003.
|
|

240-36451 viewsSeven Mile, a pair of re-walled Nippon Sharyo built waggons, control waggon 697 on the right with slave waggon 5870 on a loaded train bound of the Parker Point tippler. 31st August 2002.
|
|

241-08451 viewsNelson Point, Goninan GE rebuild C36-7M unit 5506 serial 4839-01 / 87-071 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. Drivers cab side view. 5506 was rebuilt from NSW AE Goodwin built C636 ALCo number 5455 serial G6012-04 and was delivered in Mt Newman orange livery and originally named 'Mt Whaleback', after repainting into BHP blue was named 'Ethel Creek', then finally 'Mt Goldsworthy'. June 2002.
|
|

190107 0601451 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00292 built by CSR Yangtze Co China serial 2014/382-292 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1635451 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00149 built by CSR Yangtze Co China serial 2014/382-149 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1653451 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00035 built by CSR Yangtze Co China serial 2014/382-35 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

150619 9099451 viewsFlash Butt yard, Speno owned and operated rail grinder RG2 for BHP, rail grinding module, from the left blower fans and filter housing, 5000 litre fuel tank, rear of power and driving unit, grinding hood beside bogie with spare grinding stones or wheels above bogie.
|
|

01395 080116 1382451 viewsChapman Siding looking at the F type Interlock coupler on 1395. Hand brake chain and hose bag and electric jumper cable on the left.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
457 |  |
 |
 |
 |
 |
 |
 |
|