Most viewed |

030416 084004451 viewsCarnes Siding located at the 566.4 km on the Central Australian line from Tarcoola to Alice Springs. Station nameboard. GeoData location. 16th April 2003.
|
|

240-36451 viewsSeven Mile, a pair of re-walled Nippon Sharyo built waggons, control waggon 697 on the right with slave waggon 5870 on a loaded train bound of the Parker Point tippler. 31st August 2002.
|
|

241-08451 viewsNelson Point, Goninan GE rebuild C36-7M unit 5506 serial 4839-01 / 87-071 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. Drivers cab side view. 5506 was rebuilt from NSW AE Goodwin built C636 ALCo number 5455 serial G6012-04 and was delivered in Mt Newman orange livery and originally named 'Mt Whaleback', after repainting into BHP blue was named 'Ethel Creek', then finally 'Mt Goldsworthy'. June 2002.
|
|

190107 0601451 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00292 built by CSR Yangtze Co China serial 2014/382-292 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1635451 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00149 built by CSR Yangtze Co China serial 2014/382-149 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1642451 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00336 built by CSR Yangtze Co China serial 2014/382-336 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1677451 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00191 built by CSR Yangtze Co China serial 2014/382-191 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

150619 9099451 viewsFlash Butt yard, Speno owned and operated rail grinder RG2 for BHP, rail grinding module, from the left blower fans and filter housing, 5000 litre fuel tank, rear of power and driving unit, grinding hood beside bogie with spare grinding stones or wheels above bogie.
|
|

01395 080116 1382451 viewsChapman Siding looking at the F type Interlock coupler on 1395. Hand brake chain and hose bag and electric jumper cable on the left.
|
|

02342 080304 2181451 viewsThomas Yard, down the rail welding end, side view of control waggon 2342, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

200914 7816451 viewsPilbara Railways Historical Society, four wheel waggon showing chopper coupler and chains of the this un braked rollingstock. 14th September 2020.
|
|

249-37451 viewsBurrup Peninsula gas plant, view of storage tanks, plant and visitors centre. Approximate location. 18th December 1999.
|
|

269-24451 viewsGoldsworthy Junction, and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
|
|

210407 9853451 viewsParkeston, 2MP5 intermodal train, RRXY 2, platform 4 with a CEVA RFSB type 51' container IYV 706 built by Transmech SA. The RRXY type 5-pack well waggon set is one of eleven built by Bradken Qld in 2002 for Toll from a Williams-Worley design.
|
|

210407 9856451 viewsParkeston, 2MP5 intermodal train, RQZY 7062, platform 2 with a Lindsay Transport 46' 6" RFRG type reefer container LTCD 461986. The RQZY type is a five unit bar coupled well container waggon built as one of a batch of thirty two by Goninan NSW for National Rail in 1995/96.
|
|

180-36450 viewsWodonga, the last member of V/Line broad gauge N class locomotives N 475 'City of Moe' Clyde Engineering EMD model JT22HC-2 serial 87-1204 stands near the signal box shut down having bought the morning down passenger service from Melbourne.
|
|

108-30450 viewsTatura, station yard overview, looking south, station building, goods shed, super phosphate shed.
|
|

123-2-21450 viewsSunshine track view, Newport - Sunshine Loop Line, looking towards Sunshine, double doll semaphore signal posts 36 and pulled off semaphore signal post 49, G class arriving with an up Brooklyn bound Apex quarry train.
|
|

125-10450 viewsSeymour, standard gauge mainline, ballast regulator working past loco depot, new and old sleepers along line, broad gauge ballast rake in background.
|
|

132-28450 viewsCarwarp, yard overview, Ascom silo complex, ground bunker on the left, station platform remnants at left, points for grain siding.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
456 |  |
 |
 |
 |
 |
 |
 |
|