Most viewed |

160524 4328456 viewsWest Kalgoorlie, 1MP2 steel train, RQJW 22042 one of second batch of fifty JCW type 80' container waggons built by Mittagong Engineering NSW in 1975/76. Loaded with two 45G1 type 40' boxes, RWTU 441669 and SUZU 400005.
|
|

160529 8850456 viewsParkeston, 6MP4 intermodal train, RRAY 7232
|
|

160530 9281456 viewsBinduli, 7SP3 intermodal service, RQGY 34500
|
|

160531 9838456 viewsBinduli, 3PM4 steel train, RKCX 329, an old Victorian Railways Bendigo Workshops built ELX 329 from 1970, to VOBX, VOCX, VOFX then ROBX in 1994, to RKCX in 1995.
|
|

160531 9921456 viewsWest Kalgoorlie, 1MP2 steel train, RKQF 60274
|
|

051103 6706456 viewsSpencer Junction yard, ECA 162 built by Comeng NSW in 1964 for Commonwealth Railways as a BRE type second class, air conditioned, twin berth staggered corridor steel sleeping car BRE 162. Converted to ECA type crew car in 1991. Seen here under GWA ownership on loan to Pacific National and in use on East-West freighters. Finally it was scrapped at Dry Creek in December 2014.
|
|

060107 1720456 viewsTent Hill, Pacific National RZAY type crew accommodation coach RZAY 944 on train 5PM5, originally built by Comeng NSW in 1969 as a stainless steel air conditioned first class roomette sleeping car, renumbered to 944 for Indian Pacific service, sold to National Rail Corporation in 1997 and converted to a crew coach.
|
|

060604 5579456 viewsMidland, SCT VPAY type crew accommodation car VPAY 3 'Croissant' on train 1PM9, built by Tulloch Ltd NSW in 1971 as a brake van with sleeping accommodation as HRD type HRD 276. Recoded to AVDY in December 1983, then to AVDP. In October 2000 hired to Freight Australia for crew car use as code PVDP, was later sold to Pacific National and subsequently scrapped 2016.
|
|

161112 2986456 viewsWest Kalgoorlie, loaded Malcolm sulphur train 6029, CQZY type waggon CQZY 1654, built by CIMC at Dalian China for CFCLA and one of fifteen on lease to Aurizon with an original S type sulphur container 908 and a Bis Industries roll-top 55UA type container SIBU 200602.
|
|

060429 3763456 viewsFlash Butt yard, Pony re-laying waggon, built for Mt Newman Mining in 1970 by Scotts of Ipswich, one of a batch of nine, one of a batch of nine in the series 6005-6013.
|
|

050409 0385456 viewsShell Swagman Roadhouse, Lampson Mack Titan prime mover and eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
|
|

050412 0813456 viewsAbydos Siding backtrack, view of the rear of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
|
|

030403 154446456 viewsGladstone, former South Australian Railways AE Goodwin built DL500G ALCo designated the 700 class, class leader 701 serial G6042-2 leads a grain train being loaded on the 3rd April 2003.
|
|

030404 141617456 viewsPort Augusta Spencer Junction yard, Australia Southern decal on the side of ALF 18.
|
|

242-23456 viewsPort Hedland, Don Rhodes Mining Museum, preserved Goldsworthy Mining B class unit #2 serial number A-105, these units of Bo-Bo design with a 6CSRKT 640 kW prime mover were built at the English Electric Rocklea Qld plant in 1965 and primarily used for the construction of the Mt Goldsworthy to Finucane Island railway. May 2002.
|
|

190109 1597456 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00322 built by CSR Yangtze Co China serial 2014/382-322 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

200914 7817456 viewsPilbara Railways Historical Society, axle box with WAGRYS and the year 1925 on a four wheel waggon. 14th September 2020.
|
|

246-15456 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
|
|

247-37456 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train passes under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 with 9410, 9420 and last unit 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 riding on Dofasco bogies and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. Location is here.22nd May 2002.
|
|

190107 0669456 viewsKalgoorlie, WN 522, pneumatic discharge nickel concentrate waggon, one of thirty units built by AE Goodwin NSW as WN type in 1970 for WMC.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
436 |  |
 |
 |
 |
 |
 |
 |
|