Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
23694.jpg
23694419 viewsBassendean, Goninan workshops, Mt Newman Mining's AE Goodwin built ALCo model M636 unit 5473 serial G6047-5 undergoing rebuilding into a GE CM40-8M unit, 5473 would emerge rebuilt as 5649 in July 1993. December 1992.
Jim Bisdee photo.
190107_0522.jpg
190107 0522419 viewsBinduli, following a crew change Mineral Resources empty iron ore train 2034 with Mineral Resources MRL class loco MRL 003 'Southern Cross' with serial R-0113-03/14-506 a UGL Rail Broadmeadow NSW built GE model C44ACi model leads two Pacific National NR class units NR 43 and NR 78 with 53 pairs of MHPYs and 2 single MHLY bottom discharge hopper waggons for 1293 metres and 2258 tonnes.
190107_0544.jpg
190107 0544419 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00350 built by CSR Yangtze Co China serial 2014/382-350 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0565.jpg
190107 0565419 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00295 built by CSR Yangtze Co China serial 2014/382-295 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0616.jpg
190107 0616419 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00243 built by CSR Yangtze Co China serial 2014/382-243 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0634.jpg
190107 0634419 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00001 built by CSR Yangtze Co China serial 2014/382-1 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
110620_2261.jpg
110620 2261419 viewsChapman, a loaded train of Chinese built ore waggons by CSR Zhuzhou Rolling Stock Works loaded with lump ore. 20th June 2011.
200914_7760.jpg
200914 7760419 viewsPilbara Railways Historical Society museum, 5450 a USA built EMD model F7A serial 8970 and frame 3006-A9, built Jan-1950 for Western Pacific Railroad as 917-A, imported for the Mt Newman Mining Co. to construct their Port Hedland to Newman railway in December 1967. Donated to the Society in 1978. 14th September 2020.
100603_8967.jpg
100603 8967419 viewsParkeston, SCT train 3MP9, PBHY type covered van PBHY 0046 Greater Freighter, one of a second batch of thirty units built by Gemco WA in 2006/07 without the Greater Freighter signage.
100603_8968.jpg
100603 8968419 viewsParkeston, SCT train 3MP9, PBHY type covered van PBHY 0028 Greater Freighter, one of thirty five units built by Gemco WA in 2005 without the Greater Freighter signage.
100603_9015.jpg
100603 9015419 viewsParkeston, SCT train 3MP9, ABSY type covered van ABSY 2443, originally built by Mechanical Handling SA as the batch leader of a batch of seventy VFX type covered vans between 1971/73 for Commonwealth Railways. Recoded from RBFY to ABFY September 1996, to SCT as ABFY type before being converted by Gemco WA to ABSY type in 2004/05.
128-21.jpg
128-21418 viewsGisborne semaphore signal Post 3 Up Home and Post 2 facing away Down Home signal, looking south in the Up direction, Down Distant signal Post 1 just visible in the distance.
108-34.jpg
108-34418 viewsKyabram station yard overview north end, looking toward Echuca, cattle yards in the distance.
127-05.jpg
127-05418 viewsAlbury, broad gauge passenger platform, V/Line N class N 468 'City of Bairnsdale' Clyde Engineering EMD model JT22HC-2 serial 86-1197 arriving with a down empty carriage set to form the afternoon up passenger train, double N set.
141-2-25.jpg
141-2-25418 viewsSunshine, view of all the up home signals on the passenger platforms, from semaphore and disc signal post 33 for platform No.3, semaphore and disc signal post 32 for platform No.2 and searchlight signal post 62 for platform No.1, standard gauge platform in the background.
142-1-36.jpg
142-1-36418 viewsBenalla yard overview looking north down the goods yard, removed siding is evident, stabled Wodonga goods train 9303 at right
144-21.jpg
144-21418 viewsEuroa station platform view, broad gauge VR liveried Y class Y 133 Clyde Engineering EMD model G6B serial 65-399 with the up Wahgunyah 'Stringybark Express' mixed sits in No. 2 Rd awaiting a cross, night time exposure.
146-30.jpg
146-30418 viewsWandong, station overview from the north end of down platform looking south.
149-03.jpg
149-03418 viewsRockbank, station overview looking Down direction towards Melton, No.2 Road platform and pedestrian crossing in foreground.
160-33.jpg
160-33418 viewsTallygaroopna, track view from former station building site looking across tracks to Williamstown style silo complex with train load-out spouts, road receival point behind silos and super phosphate shed at right.
19096 files on 955 page(s) 427

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional