Most viewed |

160530 9144422 viewsParkeston, SCT train 1PM9 operates mostly empty from Perth to Melbourne, ARFY type ARFY 2248 refrigerated van with a Ballarat built Maxi-CUBE body mounted on an original Commonwealth Railways ROX container waggon built by Comeng Victoria in 1971, recoded to ROX, RQX, AFQX, AQOY and RQOY before having the Maxi-CUBE refrigerated body added circa 1998 for SCT service.
|
|

161111 2469422 viewsBinduli, Kalgoorlie Freighter train 5025, ATEY 7317 diesel fuel tank waggon in service for BP Oil, former NSW AMPOL NTAF tank, coded WTEY when arrived in WA.
|
|

161111 2484422 viewsBinduli, Kalgoorlie Freighter train 5025, container flat waggon AQWY 31037, built by Centrecon Ltd WA in 1981 in a batch of thirty five WFA type container waggons, another eighteen were also built by Westrail, to WQCY in 1987, to RHQY in 1994, back to WQCY in 1995, loaded here with two 20' 22G1 type Maersk boxes for lead nitrate, MSKU 351808[8] and 825739[1].
|
|

161112 3452422 viewsBinduli, loaded Hampton acid train 7406 with AQHY 30095 with sulphuric acid tank CSA 0125, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana. CSA 0125 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions.
|
|

050409 0387422 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
|
|

060326 3217422 viewsGoldsworthy Junction, BHP track machine Tamper 3 a Plasser Australia unit model 09-3X serial M480 runs towards Nelson Point on the mainline with the new duplicated line being constructed in the foreground. 26th March 2006.
|
|

030403 162110422 viewsCrystal Brook, cab side shot of CLF class leader CLF 1 'City of Whyalla' serial 93-AN-1, rebuilt by MKA to EMD model AT26C-2M from CL class unit CL 2 in 1993. 3rd April 2003.
|
|

030404 082938422 viewsPort Germein, Perth bound steel and intermodal hurries through on the main behind National Rail's NR class units, showing one and a half stacking and new vehicles on flat waggons with empty steel loading on the rear. 4th April 2003.
|
|

170730 0490422 viewsIndee, an empty Roy Hill train rounds the curve at the Indee Rd grade crossing at the 53.3 km behind General Electric built double ES44ACi units RHA 1008 serial 62580 and RHA 1018 and 112 waggons, then the mid-train unit and then another 112 waggons. 30th July 2017. GeoData.
|
|

5949 001422 viewsBuilders plate on Goninan rebuilt GE C36-7M unit 5506 'Mt Whaleback' serial 4839-01 / 87-071 rebuilt using Mt Newman Mining AE Goodwin ALCo C636 5455 serial G6012-4. January 1987.
Jim Bisdee photo.
|
|

20859422 viewsBassendean, Goninan workshops, sitting outside the locked gates having just been bought down from Port Hedland, Mt Newman Mining's AE Goodwin ALCo C636 unit 5454 serial G6012-3 on a ninety six wheel road float. 5454 will be rebuilt into CM40-8M unit 5641 by June 1992. Image taken January 1992.
Jim Bisdee photo.
|
|

22926422 viewsBassendean, Goninan workshops, Mt Newman Mining's AE Goodwin built ALCo model M636 units 5473 serial G6047-5 and 5477 serial G6047-9 are undergoing rebuilding into a GE CM40-8M unit, 5473 would emerge rebuilt as 5649 in July 1993, while 5477 would emerge rebuilt in June 1993 as 5648. November 1992.
Jim Bisdee photo.
|
|

23907422 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5474 serial G6047-6 ALCo 251 prime mover, being stripped prior to rebuilding into CM40-8M 5655 in December 1993. July 1993.
Jim Bisdee photo.
|
|

240-16422 viewsWickham, left hand side number one end view of former Robe River and NSWGR MLW built ALCo RSC3 serial 77737 of October 1951, was originally 40 class 4006. Shows modified bogie to convert the A1A to a BO bogie type. 31st August 2002.
|
|

240-36422 viewsSeven Mile, a pair of re-walled Nippon Sharyo built waggons, control waggon 697 on the right with slave waggon 5870 on a loaded train bound of the Parker Point tippler. 31st August 2002.
|
|

190107 0519422 viewsBinduli, cab side view of Mineral Resources MRL class loco MRL 003 'Southern Cross' with serial R-0113-03/14-506 a UGL Rail Broadmeadow NSW built GE model C44ACi in 2014.
|
|

190109 1561422 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00173 built by CSR Yangtze Co China serial 2014/382-173 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1573422 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00247 built by CSR Yangtze Co China serial 2014/382-247 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

246-18422 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
|
|

110620 2020r422 viewsWalla Siding, empty BHP ore waggon 7000, a Goninan WA build of the Golynx design from April 2008. 20th of June 2011.
|
|
| 19096 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
413 |  |
 |
 |
 |
 |
 |
 |
|