Most viewed |

050421 1178466 viewsAbydos Siding backtrack, Barclay Mowlem track tamper a Fairmont Jackson model 6700 tamper side view. 21st April 2005.
|
|

0235 CNR - QRRS China 150729 9457466 viewsBing Siding, loaded CNR-QRRS of China built 60 m3 capacity ballast waggon 0235, loaded with ballast.
|
|

244-22466 viewsPort Lincoln loco workshops, still wearing the former owners AN livery, Australian Southern NJ class leader NJ 1 'Ben Chifley' Clyde Engineering EMD model JL22C serial 71-728, cab front view. 6th April, 2003
|
|

244-36466 viewsPort Lincoln loco workshops, wearing Australian Southern livery rebuild ALCo DA 7 started life as NSWGR 48 class 4813 AE Goodwin ALCo model DL531 serial 83713, rebuilt by Islington Workshops with long hood and parts from former 830 class 870 AE Goodwin ALCo model DL531 serial G6016-06 in 1998. B end roster view looking forward. 6th April 2003.
|
|

030403 154946466 viewsGladstone, former South Australian Railways AE Goodwin built DL500G ALCo designated the 700 class, class leader 701 serial G6042-2, B end cab side shot, leads a grain train being loaded on the 3rd April 2003.
|
|

030404 103712466 viewsPort Augusta Spencer Junction yard, National Rail Goninan built GE Cv40-9i model NR class unit NR 50 serial 7250-08 / 97-252 lay about the yard in between jobs. 4th April 2003.
|
|

22657466 viewsBassendean, during an Open Day at the Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. 20th July 1991.
Jim Bisdee photo.
|
|

22665466 viewsBassendean, during an Open Day at the Goninan workshops, a new 'Pilbara' cab under construction which will be fitted to a GE CM40-8M. 20th July 1991.
Jim Bisdee photo.
|
|

23731466 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5481 serial G6061-2 awaiting rebuilding into CM40-8M 5650 in July 1993. January 1993.
Jim Bisdee photo.
|
|

030415 155213466 viewsTarcoola, at the 504.5 km, looking west, end of No. 1 Water Road running straight, removed points, No. 2 Loco, then No. 1 Loco and the points for the Camp Train Roads just visible on the right. Tank on stand and underground covered tank can be made out. GeoData location. 15th April 2003.
|
|

180615 1579466 viewsWalla Siding, BHP took delivery of two new ballast ploughs in December 2017. They were built by CRRC Yangtze China in 2017 and weigh in at 65 tonnes. The ploughs are numbered BP 01 and BP 02. We finally caught up with them top and tail on a ballast consist, here's BP 01.
Roland Depth photo.
|
|

190107 0573466 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00262 built by CSR Yangtze Co China serial 2014/382-262 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0620466 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00187 built by CSR Yangtze Co China serial 2014/382-187 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0643466 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00031 built by CSR Yangtze Co China serial 2014/382-31 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1561466 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00173 built by CSR Yangtze Co China serial 2014/382-173 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

150619 9095466 viewsFlash Butt yard, Speno owned and operated rail grinder RG2 for BHP, rail grinding module, shows coupling and connections to driving module, 2500 litre water tank, electrical cabinet, blower fans and filter housing, grinding hood between bogies.
|
|

150619 9163466 viewsWalla back track, BHP track machine Tamper 3 a Plasser Australia unit model 09-3X serial M480. 19th June 2015.
|
|

01187 080116 1376466 viewsChapman Siding, FMG slave waggon 1187, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China during 2007, view of the number decal builders plate and bracket for RFID tag with the last painted date placard. 16th January 2008.
|
|

TK 09 110620 2273466 viewsChapman, FMG TK type fuel tank waggon TK 09 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
|
|

250-11466 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 on the loop as a loaded train with 210 waggons passes behind a sister pairing of 7072 serial 47751 and 7074 serial 47753. 1550 hrs 21st October 2000.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
396 |  |
 |
 |
 |
 |
 |
 |
|