Most viewed |

240-30429 viewsSeven Mile, Pilbara Rail, Robe River owned, General Electric built Dash 9-44CW unit 9470 serial 53455. This and sister units 9471 and 9472 were the first painted in the Pilbara Rail livery. 31st August 2002.
|
|

242-10429 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
|
|

242-23429 viewsPort Hedland, Don Rhodes Mining Museum, preserved Goldsworthy Mining B class unit #2 serial number A-105, these units of Bo-Bo design with a 6CSRKT 640 kW prime mover were built at the English Electric Rocklea Qld plant in 1965 and primarily used for the construction of the Mt Goldsworthy to Finucane Island railway. May 2002.
|
|

190107 0543429 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00122 built by CSR Yangtze Co China serial 2014/382-122 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0586429 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00199 built by CSR Yangtze Co China serial 2014/382-199 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0595429 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00164 built by CSR Yangtze Co China serial 2014/382-164 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0606429 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00012 built by CSR Yangtze Co China serial 2014/382-12 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1561429 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00173 built by CSR Yangtze Co China serial 2014/382-173 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

150619 9163429 viewsWalla back track, BHP track machine Tamper 3 a Plasser Australia unit model 09-3X serial M480. 19th June 2015.
|
|

080116 1375429 viewsChapman Siding, view of FMG's CSR Zhuzhou Rolling Stock Works built waggons showing the 'F' type Interlock fixed and rotary couplers between master waggon 2396 and slave waggon 1187. Note the difference in the tare weights, 2396 with the fixed coupler is the master waggon, while 1187 is the slave waggon with the rotary coupler. The yellow circle also denotes the rotary coupler end. 16th January 2008.
|
|

246-19429 viewsCape Lambert, a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 riding on Dofasco bogies and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
|
|

140601 4466429 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7753 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|

100603 9030429 viewsParkeston, SCT train 3MP9, ARFY type ARFY 2394 refrigerated van with the original style short side doors Fairfax (NZL) built fibreglass body that has been fitted to a Perry Engineering SA 1971 built ROX type flat waggon that was in service with Commonwealth Railways and recoded though RQX - AFQX - AQOY - RQOY codes before conversion.
|
|

172-23428 viewsBallarat East, semaphore signal post 3, looking west towards Ballarat, new electric colour light signal installed, baulks on the end of the former Eureka line, Ballarat East loco depot on the left, electric colour dwarf signal between mainlines.
|
|

179-21428 viewsGheringhap, station yard overview looking east from the Ballarat line and Siding C, the line to Maroona is on the right, in the back ground semaphore signal post 4 is pulled of for down goods train 9169 to depart, V/Line broad gauge X class locomotive X 51 Clyde Engineering EMD model G26C serial 75-798 is awaiting light engines from Geelong to come and retrieve it.
|
|

180-32428 viewsWodonga turntable radial roads finds V/Line broad gauge Y class shunt loco Y 124 Clyde Engineering EMD model G6B serial 63-314 resting between jobs.
|
|

130-18428 viewsRochester station overview, looking towards Echuca from the south end, goods shed, station building, points to dock road at right.
|
|

132-22428 viewsMildura loco depot, looking north, grounded B van, brake pit, V/Line broad gauge locos, Y class Y 165 Clyde Engineering EMD model G6B serial 68-585, G class G 512 Clyde Engineering EMD model JT26C-2SS serial 84-1240 and X class X 32 Clyde Engineering EMD model G16C serial 66-485.
|
|

131-2-15428 viewsCaldwell track view, rice storage sheds, Ascom silo complex in the background, points and point lever, loading spouts.
|
|

135-20428 viewsKilmore East Apex Quarry siding, V/Line broad gauge G class G 540 Clyde Engineering EMD model JT26C-2SS serial 89-1273 on the front of the stone train as it is loaded by the front-end wheel loader.
|
|
| 19096 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
385 |  |
 |
 |
 |
 |
 |
 |
|