Most viewed |

160530 9174432 viewsParkeston, SCT train 7GP1 which operates from Parkes NSW (Goobang Junction) to Perth, PBHY type covered van PBHY 0025 Greater Freighter, one of thirty five units built by Gemco WA in 2005 without the Greater Freighter signage but with Big W We Sell For Less logo.
|
|

160530 9188432 viewsParkeston, SCT train 7GP1 which operates from Parkes NSW (Goobang Junction) to Perth, PBHY type covered van PBHY 0101 Greater Freighter, built by CSR Meishan Rolling Stock Co China in 2014 without the Greater Freighter signage.
|
|

160530 9204432 viewsParkeston, SCT train 7GP1 which operates from Parkes NSW (Goobang Junction) to Perth, PBHY type covered van PBHY 0099 Greater Freighter, built by CSR Meishan Rolling Stock Co China in 2014 without the Greater Freighter signage.
|
|

160530 9213432 viewsParkeston, SCT train 7GP1 which operates from Parkes NSW (Goobang Junction) to Perth, PWWY type PWWY 0005 one of forty well waggons built by Bradken NSW for SCT, loaded with two 48' MFG1 type boxes, Rail Containers SCFU 412559 and SCT SCTDS 4845.
|
|

161111 2476432 viewsBinduli, Kalgoorlie Freighter train 5025, diesel fuel tank waggon ATPY 587 built by Westrail Midland Workshops in 1978 for Mobil, later sold to BP, as type WJP then recoded to WJPY, 80.66 kL one compartment one dome, original code and fleet no. visible, with a capacity now of 80000 litres.
|
|

161116 5124432 viewsWest Kalgoorlie, Shell fuel train 3442, ATLF 562 tank waggon, built by WAGR Midland Workshops 1973 for Shell as type WJL 86.49 kL one compartment one dome with a capacity of 80500 litres, fitted with type F InterLock couplers.
|
|

040815 164652432 viewsNelson Point, CFCLA ballast waggon CHQY type 730 just being delivered to BHP Iron Ore as part of the Rail PACE project, side view.
|
|

050518 2124432 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 750, shows ownership plaque.
|
|

050624 3335432 viewsGoldsworthy, the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star as a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port.
|
|

060714 6813432 viewsHesta Siding, view from the rear of the rail recovery and transport train as it snakes around the curves. Crib waggon 665 a former Magor USA built ore waggon, heavily modified by Mt Newman Mining workshops and fitted with an ATCO donga.
|
|

050421 1142432 viewsGillam Siding backtrack, BHP's ballast regulator BR 31 a Plasser Australia SSP 110SW model serial 401, 94.9 km marking on the rail. 21st April 2005.
|
|

244-24432 viewsPort Lincoln loco workshops, still wearing the former owners AN livery, Australian Southern NJ class leader NJ 1 Clyde Engineering EMD model JL22C serial 71-728 coupled to 830 class 869 AE Goodwin ALCo model DL531 serial G6016-05. 6th April 2003.
|
|

030404 125227432 viewsPort Augusta Spencer Junction yard, a pair of back to back National Rail NR class units built by Goninan as GE Cv40-9i models showing the coupling between two unit, NR 50 serial 7250-08 / 97-252 is on the right. 4th April 2003.
|
|

030404 141628432 viewsPort Augusta Spencer Junction yard, City of Port Pirie name plate on the side of ALF 18.
|
|

170728 09855432 viewsWestern Creek - Emu area, Rio Tinto's General Electric built ES44DCi class leader 8100 serial 57996 leads two sister units, in 8176 and 8143 both in the later Rio Tinto stripe livery, with a loaded train running down from Emu Siding on the line to Dampier. The disabled Mesa A train is still on the bridge, the line to the left of the loaded is the Robe River Western Creek - Emu interconnecting line. 28th July 2017. GeoData.
|
|

060724 7865432 viewsOriginal Hamersley Iron compressor waggon set IC-1 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 24th July 2006.
|
|

5942 001 Welshpool 1986Sept432 viewsWelshpool, Goninan workshops, Mt Newman Mining C636 ALCo unit 5452 serial G6012-1 built by AE Goodwin in May 1968 is undergoing a world first as it gets rebuilt into a GE C36-7M locomotive. In the September 1986 view the process has started and it is on shop bogies, by July 1987 it would become 5509. Sept 1986.
Jim Bisdee photo.
|
|

22657432 viewsBassendean, during an Open Day at the Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. 20th July 1991.
Jim Bisdee photo.
|
|

22658432 viewsBassendean, during an Open Day at the Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M in the background and the two types of bogie which rode under the Mt Newman Mining ALCo units, in front is the ALCo Hi-Ad truck and behind is the MLW Dofasco truck. 20th July 1991.
Jim Bisdee photo.
|
|

22664432 viewsBassendean, during an Open Day at the Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. 20th July 1991.
Jim Bisdee photo.
|
|
| 19096 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
369 |  |
 |
 |
 |
 |
 |
 |
|