Most viewed |

160530 9145482 viewsParkeston, SCT train 1PM9 operates mostly empty from Perth to Melbourne, ARFY type ARFY 2243 refrigerated van with a Ballarat built Maxi-CUBE body mounted on an original Commonwealth Railways ROX container waggon built by Comeng Victoria in 1971, recoded to ROX, RQX, AFQX, AQOY and RQOY before having the Maxi-CUBE refrigerated body added circa 1998 for SCT service.
|
|

160530 9152482 viewsParkeston, SCT train 1PM9 operates mostly empty from Perth to Melbourne, PBGY type covered van PBGY 0158 Multi-Freighter, one of eighty units built by Gemco WA, with Independent Brake signage.
|
|

161111 2405482 viewsKalgoorlie, Malcolm freighter train 5029, waggon AQNY 32180 one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic with an undecorated Bis Industries hard-top 25U0 type sulphur container BISU 100048 and original style sulphur container S107U 949 with original style door and sliding tarpaulin.
|
|

161111 2413482 viewsKalgoorlie, Malcolm freighter train 5029, waggon AQNY 32153 one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic with a Bis Industries roll-top 55UA type sulphur container 200628 and an original style sulphur container S24 with sliding tarpaulin roof.
|
|

161112 2987482 viewsWest Kalgoorlie, loaded Malcolm sulphur train 6029, AQNY type waggon AQNY 32167 one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic with original style sulphur container with sliding tarpaulin S103H G948 with walking man logo and non decaled Bis Industries hard-top 25U0 type sulphur container BISU 100058.
|
|

161112 2994482 viewsWest Kalgoorlie, loaded Malcolm sulphur train 6029, AQNY type waggon AQNY 32152 one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic with Bis Industries roll-top type 55UA container SBIU 200631 and a hard-top type 25U0 container BISU 100082.
|
|

0044 CNR - QRRS China 160128 00331482 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0044, one of a second batch delivered in 2015 with safety slogan 'Don't drive distracted'.
|
|

030404 141224482 viewsPort Augusta Spencer Junction yard, MKA (Morrison Knudsen Australia) rebuilt AL class AL 24 into EMD JT26C-2M model for Australian National in 1993 as the ALF class, here ALF 20 serial 94-AB-020 shunts empty rail transport waggon sets from the Darwin construction. 4th April, 2003.
|
|

170730 0482482 viewsIndee, a loaded FMG iron ore train crosses Indee Rd grade crossing at the 48 km as it runs to the port behind NS Juniata Shops rebuild EMD SD90MAC-H unit 903 serial 976833-18 and General Electric built Dash 9-44CW class leader unit 001. 903 had the 245-H engine replaced with a 710 in 2014. The line to the right is the Roy Hill line. 30th July 2017. GeoData.
|
|

030415 145938482 viewsFerguson, located at the 469 km on the Trans Australian Railway, looking west at the east end of the 1800 metre long crossing loop, point work on timber sleepers, indicator and lever with dual control point machine on the right. GeoData location.
|
|

242-11482 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
|
|

242-32482 viewsPort Hedland, Don Rhodes Mining Museum, preserved Mt Newman Mining Comeng NSW built ALCo M636 unit 5497 serial C6096-2, view of roof. May 2002.
|
|

190107 0450482 viewsParkeston, Mineral Resources Ltd bogie on MHPY type iron ore waggon MHPY 00013 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0611482 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00117 built by CSR Yangtze Co China serial 2014/382-117 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

6980 001482 viewsWelshpool, Goninan Open Day 27th August, 1988. View from No.2 end of under construction GE CM39-8 locomotive 5632 serial 5831-11 / 88-081 being built for Mt Newman Mining.
Jim Bisdee photo.
|
|

080621 2795482 viewsWalla back track, BHP track machine TM04 a Plasser Australia unit model 09-3X serial M489. 21st June 2008.
|
|

150619 9161482 viewsWalla back track, BHP track machine Tamper 3 a Plasser Australia unit model 09-3X serial M480. 19th June 2015.
|
|

02396 080116 1381482 viewsChapman Siding looking north inside ore waggon 2396. The visible angle iron welded to the floor are covers for the water drain holes.
|
|

246-13482 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
|
|

05745-06746 210321 9302482 viewsBoodarie on the 5 km curve loaded FMG ore waggon pair 5745 and 6746 were built by CSR Yangtze with a prototype pressed lower panels. This pair is the same as 3005 - 4006. 21st March 2021.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
330 |  |
 |
 |
 |
 |
 |
 |
|