Most viewed |

160522 2342474 viewsParkeston, 7MP7 priority service train, platform 1 of 5-pack Goninan built RRZY 7034 well waggon set, FCL 40' box FCGU 324645[4].
|
|

160522 2383474 viewsParkeston, 7MP7 priority service train, platform 3 of 5 on RRQY 7330 5-pack articulated skel waggon set built by Qiqihar Rollingstock Works China in 2005 for Pacific National, with a 48' MFG1 type box PNXD 018.
|
|

160522 2386474 viewsParkeston, 7MP7 priority service train, RQWW 22024 container waggon, one of thirty two built by Comeng NSW in 1973-75 as JCW type, recoded to NQJW, with a 48' Pacific National curtainsider PNXC 4447.
|
|

160522 2411474 viewsParkeston, 7MP7 priority service train, platform 4 of 5 on RRQY 7327 5-pack articulated skeletal waggon set built by Qiqihar Rollingstock Works China in 2005 for Pacific National, with a 46' 6" Rand Refrigerated Logistics reefer RAND 207.
|
|

160522 2425474 viewsParkeston, 7MP7 priority service train, platform 5 of 5-pack RRGY 7129 5 pack articulated skel waggon set, originally built as RRBY by AN Rail at Islington Workshops SA 1996-97, 40' deck with a Rail Containers 4EG1 type box SCFU 412065[0].
|
|

160529 8758474 viewsParkeston, 6MP4 intermodal train, arrives on the mainline behind a pair of Goninan built GE model Cv40-9i NR class units NR 89 serial 7250-05 / 97-292 and NR 4 serial 7250-11 / 96-206.
|
|

160531 9914474 viewsWest Kalgoorlie, 1MP2 steel train, RKLY 20556
|
|

160601 10096474 viewsWest Kalgoorlie, 2MP5 intermodal train, 5-pack RRRY 7007 well waggon set, one of nineteen built in China at Zhuzhou Rolling Stock Works for Goninan in 2005, double stacked with a range of types and sizes including 53' auto boxes, 40' half height side doors, 46' 6" reefers and 48' boxes.
|
|

160609 0485474 viewsWoodbridge, 5PM5 intermodal train, RRAY 7180 platform 5 of 5-pack articulated skel waggon set, one of a hundred built by ABB Engineering NSW 1996-2000, 40' deck with two 20' boxes, a 25G1 type Royal Wolf RWTU 965616[6] and a 2EG9 type Linfox FSWB 963508[0].
|
|

160522 2255474 viewsParkeston, SCT train 6MP9 operating from Melbourne to Perth, ABSY type ABSY 4458 covered van, originally built by Comeng WA in 1977 for Commonwealth Railways as VFX type, recoded to ABFX and RBFX to SCT as ABFY before conversion by Gemco WA to ABSY in 2004/05.
|
|

160522 2285474 viewsParkeston, SCT train 6MP9 operating from Melbourne to Perth, PBGY type covered van PBGY 0004 Multi-Freighter, one of eighty two waggons built by Queensland Rail Redbank Workshops in 2005.
|
|

160524 3702474 viewsKalgoorlie, SCT train 2PM9 operating from Perth to Melbourne, ARFY type ARFY 2181 refrigerated van with New Zealand built Fairfax body mounted on an original Commonwealth Railways ROX container waggon built by Comeng Quds in 1970, recoded to AFQX, then AQOX and RQOY before being fitted with the refrigerated body for SCT service circa 1998.
|
|

160524 3708474 viewsKalgoorlie, SCT train 2PM9 operating from Perth to Melbourne, ABSY type ABSY 4458 covered van, originally built by Comeng WA in 1977 for Commonwealth Railways as VFX type, recoded to ABFX and RBFX to SCT as ABFY before conversion by Gemco WA to ABSY in 2004/05.
|
|

160526 5279474 viewsWest Kalgoorlie, SCT train 3MP9 operating from Melbourne to Perth, with 76 waggons for 5709.8 tonnes and 1795 metres with EDI Downer built EMD model GT46C-ACe unit SCT 012 serial 08-1736 as second unit to sister unit SCT 014 as they hold the mainline in West Kalgoorlie waiting for the Prospector railcar to cross.
|
|

160530 9091474 viewsParkeston, return SCT working 1PM9 led by SCT 004 crosses opposing SCT Perth bound train 7GP1 with SCT 013 on the lead waiting on the mainline. Before SCT introduced these AC traction locomotives the original operations were powered by three of four 3000 hp DC locomotives.
|
|

050410 0521474 viewsNelson Point yard hard stand area rear view of brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

170728 09716474 views38 km on approach to Harding Siding an empty train rounds the curve under the Water Corp pipe bridge lead by Rio Tinto stripe liveried unit 8147 serial 58728 an General Electric built ES44DCi unit with a sister unit 8149 sandwiching 7065 a Dash 9-44CW unit. 28th July 2017. GeoData.
|
|

20955474 viewsBassendean, Goninan workshops, sitting outside the gates waiting to head to Cape Lambert, Robe River Goninan GE CM40-8M rebuild unit 9411 serial 8206-02 / 92-125, retains its original Robe River road number on a hundred and twenty wheel road float. 9411 was rebuilt into the GE CM40-8M unit from AE Goodwin ALCo M636 serial G6060-2. February 1992.
Jim Bisdee photo.
|
|

23713474 viewsBassendean, Goninan workshops, Mt Newman Mining's AE Goodwin built ALCo model M636 unit 5473 serial G6047-5 being scrapped to frame level, cab section on truck. December 1992.
Jim Bisdee photo.
|
|

242-04474 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5509 serial 4839-05 / 87-074 about to be trucked to United Goninan Perth for eventual cutting down to the frame and heading to United Goninan Broadmeadow NSW as an engine test bed. May 2002.
|
|
| 19096 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
210 |  |
 |
 |
 |
 |
 |
 |
|