Most viewed - Roy_Hill_Rolling_Stock |

150314 7789281 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2144 end view showing the F type coupler, hose and electrical connection and uncoupling lever, only the even numbered waggons, or control waggon, has an uncoupling lever, the odd numbered, or slave waggons do not. March 14. 2015.
|
|

250501 0333280 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2273 - GA 2274, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0402280 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2863 - GA 2864, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0422280 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2035 - GA 2036, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0490280 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2655 - GA 2656, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0510280 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2251 - GA 2252, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0481279 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3359 - GA 3360, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

250501 0488279 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3127 - GA 3128, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0522279 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2781 - GA 2782, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0319278 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3005 - GA 3006, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0352278 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2755 - GA 2756, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0359278 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3049 - GA 3050, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0369278 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3593 - GA 3594, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

250501 0499278 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3099 - GA 3100, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0529278 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2871 - GA 2872, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0317277 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2759 - GA 2760, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0392277 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3475 - GA 3476, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

250501 0408277 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3041 - GA 3042, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0412277 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2669 - GA 2670, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0413277 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2873 - GA 2874, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|
| 256 files on 13 page(s) |
 |
 |
 |
 |
 |
 |
 |
9 |  |
 |
 |
|