Most viewed - Roy_Hill_Rolling_Stock |

250501 0457364 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2117 - GA 2118, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0547363 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2857 - GA 2858, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0310352 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2395 - GA 2396, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0472346 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3089 - GA 3090, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0314340 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3181 - GA 3182, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0341340 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3431 - GA 3432, built in China by CSR Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

250501 0434338 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3601 - GA 3602, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

250501 0304336 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2943 - GA 2944, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0307334 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2197 - GA 2198, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0312334 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2141 - GA 2142, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0346329 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3243 - GA 2444, built in China by CSR Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

150314 7779329 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2080 side view showing the SSRM bogie. March 14. 2015.
|
|

250501 0315327 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2291 - GA 2292, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0357326 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2409 - GA 2410, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0421326 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2111 - GA 2112, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

150314 7776324 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2080 side view showing the park brake arrangement. March 14. 2015.
|
|

250501 0435323 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2627 - GA 2628, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0509323 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2461 - GA 2461, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0324322 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3197 - GA 3198, the first pair of the second batch and the first painted pink, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

250501 0471322 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3453 - GA 3454, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|
| 256 files on 13 page(s) |
1 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|