Most viewed - Roy_Hill_Rolling_Stock |

250501 0457405 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2117 - GA 2118, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0310402 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2395 - GA 2396, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0547401 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2857 - GA 2858, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0341388 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3431 - GA 3432, built in China by CSR Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

250501 0434386 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3601 - GA 3602, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

250501 0472383 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3089 - GA 3090, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0437381 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2157 - GA 2158, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0314377 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3181 - GA 3182, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0421376 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2111 - GA 2112, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

150314 7779374 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2080 side view showing the SSRM bogie. March 14. 2015.
|
|

250501 0315373 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2291 - GA 2292, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0304364 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2943 - GA 2944, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0435364 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2627 - GA 2628, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0303363 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2539 - GA 2540, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0307363 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2197 - GA 2198, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0312363 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2141 - GA 2142, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0380362 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2261 - GA 2262, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0554362 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2931 - GA 2932, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0324361 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3197 - GA 3198, the first pair of the second batch and the first painted pink, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

250501 0471361 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3453 - GA 3454, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|
| 256 files on 13 page(s) |
1 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|