Most viewed - 0249 |

249-311856 viewsA loaded Hamersley Iron train runs across the plains north of Dugite Siding near the 70 km as it nears the destination of its cargo behind the standard pair of GE built Dash 9-44CW locomotives 7084 serial 47763 and 7079 serial 47758 both in the original Pepsi Can livery. Approximate location. 18th December 1999.
|
|

249-32510 viewsA loaded Hamersley Iron train runs across the plains north of Dugite Siding near the 70 km as it nears the destination of its cargo behind the standard pair of GE built Dash 9-44CW locomotives 7084 serial 47763 and 7079 serial 47758 both in the original Pepsi Can livery. Approximate location. 18th December 1999.
|
|

249-22469 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking upstream following Cyclone John on 18th December 1999. Approximate location.
|
|

249-05436 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-30416 viewsA loaded Hamersley Iron train runs across the plains north of Dugite Siding near the 70 km as it nears the destination of its cargo behind the standard pair of GE built Dash 9-44CW locomotives 7084 serial 47763 and 7079 serial 47758 both in the original Pepsi Can livery. Approximate location. 18th December 1999.
|
|

249-37402 viewsBurrup Peninsula gas plant, view of storage tanks, plant and visitors centre. Approximate location. 18th December 1999.
|
|

249-33399 viewsLoaded Hamersley Iron ore waggon pair National Steel USA built 5126 and Nippon Sharyo Japan built 770. Approximate location. 18th December 1999.
|
|

249-07394 viewsYule River bridge looking north east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-29390 viewsA loaded Hamersley Iron train runs across the plains north of Dugite Siding near the 70 km as it nears the destination of its cargo behind the standard pair of GE built Dash 9-44CW locomotives 7084 serial 47763 and 7079 serial 47758 both in the original Pepsi Can livery. Approximate location. 18th December 1999.
|
|

249-09389 viewsYule River bridge looking east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-27383 viewsA loaded Hamersley Iron train runs across the plains north of Dugite Siding near the 70 km as it nears the destination of its cargo. Approximate location. 18th December 1999.
|
|

249-17381 viewsTable Hill on the Robe River railway line, looking in a northerly direction as the railway line snakes north and heads through Lockyer Gap towards Cape Lambert. Following a very wet 1999 cyclone season Lake Poongkaliyarra is very full. Approximate location.
|
|

249-23380 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking downstream to the west following Cyclone John on 18th December 1999. Approximate location.
|
|

249-01379 viewsYule River road crossing on the former Hedland - Wittenoom Road in flood after Tropical Cyclone John in December 1999. Approximate location.
|
|

249-28378 viewsA loaded Hamersley Iron train runs across the plains north of Dugite Siding near the 70 km as it nears the destination of its cargo behind the standard pair of GE built Dash 9-44CW locomotives 7084 serial 47763 and 7079 serial 47758 both in the original Pepsi Can livery. Approximate location. 18th December 1999.
|
|

249-04376 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-06372 viewsYule River bridge looking east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-34372 viewsLoaded Hamersley Iron ore waggon pair Tomlinson Steel WA built 5708 and Nippon Sharyo Japan built 906. Approximate location. 18th December 1999.
|
|

249-18369 viewsTable Hill on the Robe River railway line, a microwave radio communications site powered by solar panels. Approximate location.
|
|

249-02368 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|
|
|