Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > Robe_River_Rolling_Stock

Most viewed - Robe_River_Rolling_Stock
IC20_070908_0594.jpg
IC20 070908 0594420 viewsRobe River compressor waggon sets IC 20 with air receiver and IC 21 with two Ingersoll Rand air compressors and IC 22 with receiver and IC 23 with compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons and used on the pooled fleet rakes that come from HIY [Yandicoogina] and West Angelas mines. Cape Lambert yard, August 8 2007.
IC22_070908_0595.jpg
IC22 070908 0595406 viewsRobe River compressor waggon set IC 22 with air receiver and IC 23 with two Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons and used on the pooled fleet rakes that come from HIY [Yandicoogina] and West Angelas mines. Cape Lambert yard, August 8, 2007.
IC20_070908_0596.jpg
IC20 070908 0596394 viewsRobe River compressor waggon set IC 20 with air receiver and IC 21 with two Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons and used on the pooled fleet rakes that come from HIY [Yandicoogina] and West Angelas mines. Cape Lambert yard August 8, 2007.
9006_070909_0655.jpg
9006 070909 0655387 viewsRobe River compressor waggon 9006 on the lead of a Deepdale rake going through the car dumper at Cape Lambert. Fitted with an Atlas Copco XAS 85 compressor, fuel tank and air receiver. This waggon is a modified Tomlinson Steel built ore waggon. September 9, 2007.
0547_170729_0197.jpg
0547 170729 0197221 viewsRobe River ore waggon 547, built by Tomlinson Steel WA, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
0664_060716_7192.jpg
0664 060716 7192218 viewsRobe River ore waggon 664, built by Tomlinson Steel WA, fixed coupler end handbrake side loaded view at the 71 km on the Deepdale line, Western Creek, July 16, 2006.
0316_160306_1326.jpg
0316 160306 1326206 viewsRobe River ore waggon 316, built by Nippon Sharyo Nihon, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
1145_160727_0957.jpg
1145 160727 0957205 viewsRobe River ore waggon 1145, built by Bradken Rail Qld in March 2012, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.
0243_160306_1475.jpg
0243 160306 1475203 viewsRobe River ore waggon 243, built by Nippon Sharyo Nihon, fixed coupler handbrake side loaded view at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
0544_160306_1460.jpg
0544 160306 1460202 viewsRobe River ore waggon 544, built by Tomlinson Steel WA, fixed coupler handbrake side loaded view, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
1043_210322_9697.jpg
1043 210322 9697196 viewsRobe River ore waggon 1043, built by Bradken Rail Qld in March 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021.
0539_060722_7608.jpg
0539 060722 7608188 viewsRobe River ore waggon 539, built by Tomlinson Steel WA, rotary coupler end handbrake side empty view, at the 11.7 km, Cape Lambert. July 22, 2006.
0637_160306_1328.jpg
0637 160306 1328188 viewsRobe River ore waggon 637, built by Tomlinson Steel WA, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
1041_210322_9700.jpg
1041 210322 9700188 viewsRobe River ore waggon 1041, built by Bradken Rail Qld in March 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021.
0492_141124_6779.jpg
0492 141124 6779187 viewsRobe River ore waggon 492, built by Tomlinson Steel WA, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
1066_210322_9793.jpg
1066 210322 9793187 viewsRobe River ore waggon 1066, built by Bradken Rail Qld in March 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021.
0540_160306_1329.jpg
0540 160306 1329185 viewsRobe River ore waggon 540, built by Tomlinson Steel WA, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
1047_210322_9682.jpg
1047 210322 9682185 viewsRobe River ore waggon 1047, built by Bradken Rail Qld in March 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021.
0313_160306_1416.jpg
0313 160306 1416184 viewsRobe River ore waggon 313, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side loaded view at Greenpool Siding on the Cape Lambert line. March 6, 2016.
0547_160727_0974.jpg
0547 160727 0974183 viewsRobe River ore waggon 547, built by Tomlinson Steel WA, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.
1831 files on 92 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional